{"title":"PEMASANGAN JEMBATAN GIRDER BAJA TRANSYOGI MENGGUNAKAN INCREMENTAL LAUNCHING METHOD DI PROYEK JALAN TOL ELEVATED CIMANGGIS–CIBITUNG, STA +28.600–STA +28.800","authors":"Basuki . Muchlis, Demy Yuni Cahyadi","doi":"10.26593/jhpji.v8i2.5996.123-138","DOIUrl":null,"url":null,"abstract":"Abstract \n \nThe Transyogi Bridge is a steel bridge that connects the Cimanggis-Cibitung Toll Road. This bridge consists of 2 units of a series of steel tub girders on pier 37-pier 38-pier 39, which crosses the Cikeas river, with the lengths of the bridges being 57 m and 65 m, respectively. This study discusses the basis for choosing the method of installing a steel tub girder bridge using the incremental launching method. This method is used to overcome the limitations of field conditions, due to the presence of high-voltage overhead lines, gas pipeline crossings, and river crossings on the bridge installation route. This study shows that the use of incremental launching method is very appropriate compared to using other methods. \n \nKeywords: bridge; steel bridge; bridge installation; incremental launching method \n \n \nAbstrak \n \nJembatan Transyogi merupakan jembatan baja yang menghubungkan Jalan Tol Cimanggis–Cibitung. Jembatan ini terdiri atas 2 unit rangkaian steel tub girder pada pier 37-pier 38-pier 39, yang melintas di atas sungai Cikeas, dengan panjang masing-masing jembatan adalah 57 m dan 65 m. Pada studi ini dibahas dasar pemilihan metode pemasangan jembatan steel tub girder menggunakan incremental launching method. Metode ini digunakan untuk mengatasi batasan kondisi lapangan, karena adanya saluran udara tegangan tinggi, crossing pipa gas, dan crossing sungai pada jalur pemasangan jembatan. Studi ini menunjukkan bahwa penggunaan incremental launching method ini sangat tepat dibandingkan dengan menggunakan metode-metode yang lain. \n \nKata-kata kunci: jembatan; jembatan baja; pemasangan jembatan; incremental launching method","PeriodicalId":122843,"journal":{"name":"Jurnal HPJI","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal HPJI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26593/jhpji.v8i2.5996.123-138","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
Transyogi大桥是连接慈芒吉斯-慈碧东收费公路的一座钢桥。该桥横跨Cikeas河,由37- 38- 39号桥墩上的2组系列钢桶梁组成,桥梁长度分别为57米和65米。本文探讨了采用增量下水法安装钢桶梁桥方法的选择依据。这种方法用于克服现场条件的限制,因为在桥梁安装路线上存在高压架空线路、天然气管道交叉点和河流交叉点。本研究表明,与其他方法相比,采用增量发射法是非常合适的。关键词:桥梁;钢桥;桥安装;【摘要】Jembatan Transyogi merupakan Jembatan baja yang menghubungkan Jalan Tol cimangis - cibitung。Jembatan ini terdiri atas 2单元rangkaian钢桶梁桥墩37-桥墩38-桥墩39,yang melintas di ata sungai Cikeas, dengan panjang masing-masing Jembatan adalah 57 m丹65 m。研究了钢桶梁的增量下水法。Metode ini digunakan untuk mengatasi batasan kondisi lapangan, karena adanya saluran udara tegangan tinggi,穿越琵琶气,dan穿越sungai pada jalur pemasangan jembatan。研究了渐进式发射的方法,包括:渐进式发射,渐进式发射。kata kunci: jembatan;jembatan半岛;pemasangan jembatan;增量发射法
PEMASANGAN JEMBATAN GIRDER BAJA TRANSYOGI MENGGUNAKAN INCREMENTAL LAUNCHING METHOD DI PROYEK JALAN TOL ELEVATED CIMANGGIS–CIBITUNG, STA +28.600–STA +28.800
Abstract
The Transyogi Bridge is a steel bridge that connects the Cimanggis-Cibitung Toll Road. This bridge consists of 2 units of a series of steel tub girders on pier 37-pier 38-pier 39, which crosses the Cikeas river, with the lengths of the bridges being 57 m and 65 m, respectively. This study discusses the basis for choosing the method of installing a steel tub girder bridge using the incremental launching method. This method is used to overcome the limitations of field conditions, due to the presence of high-voltage overhead lines, gas pipeline crossings, and river crossings on the bridge installation route. This study shows that the use of incremental launching method is very appropriate compared to using other methods.
Keywords: bridge; steel bridge; bridge installation; incremental launching method
Abstrak
Jembatan Transyogi merupakan jembatan baja yang menghubungkan Jalan Tol Cimanggis–Cibitung. Jembatan ini terdiri atas 2 unit rangkaian steel tub girder pada pier 37-pier 38-pier 39, yang melintas di atas sungai Cikeas, dengan panjang masing-masing jembatan adalah 57 m dan 65 m. Pada studi ini dibahas dasar pemilihan metode pemasangan jembatan steel tub girder menggunakan incremental launching method. Metode ini digunakan untuk mengatasi batasan kondisi lapangan, karena adanya saluran udara tegangan tinggi, crossing pipa gas, dan crossing sungai pada jalur pemasangan jembatan. Studi ini menunjukkan bahwa penggunaan incremental launching method ini sangat tepat dibandingkan dengan menggunakan metode-metode yang lain.
Kata-kata kunci: jembatan; jembatan baja; pemasangan jembatan; incremental launching method