{"title":"C-17,成功应用现有的自动测试设备","authors":"F. Sidhwa, P. Bothello","doi":"10.1109/AUTEST.1994.381569","DOIUrl":null,"url":null,"abstract":"The C-17 Program utilizes existing B-IB Automatic Test Equipment (ATE). The C-17 decision is in harmony with the Air Force emphasis on reducing proliferation of unique ATE. The ATE selection was made after consideration of cost, performance and supportability tradeoffs. Minimal augmentation of the government inventoried equipment was required which did not affect the existing hardware and software configuration. This approach significantly reduced C-17 program ATE development costs and afforded the program the use of established logistics elements and support structure. The C-17 program demanded concurrency of support structure and aircraft development-the ATE solution met that demand by reducing risks to a manageable level for both test program set development, and Air Force operation and training requirements.<<ETX>>","PeriodicalId":308840,"journal":{"name":"Proceedings of AUTOTESTCON '94","volume":"166 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"C-17, successful application of existing automatic test equipment\",\"authors\":\"F. Sidhwa, P. Bothello\",\"doi\":\"10.1109/AUTEST.1994.381569\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The C-17 Program utilizes existing B-IB Automatic Test Equipment (ATE). The C-17 decision is in harmony with the Air Force emphasis on reducing proliferation of unique ATE. The ATE selection was made after consideration of cost, performance and supportability tradeoffs. Minimal augmentation of the government inventoried equipment was required which did not affect the existing hardware and software configuration. This approach significantly reduced C-17 program ATE development costs and afforded the program the use of established logistics elements and support structure. The C-17 program demanded concurrency of support structure and aircraft development-the ATE solution met that demand by reducing risks to a manageable level for both test program set development, and Air Force operation and training requirements.<<ETX>>\",\"PeriodicalId\":308840,\"journal\":{\"name\":\"Proceedings of AUTOTESTCON '94\",\"volume\":\"166 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1994-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of AUTOTESTCON '94\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AUTEST.1994.381569\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of AUTOTESTCON '94","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AUTEST.1994.381569","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

C-17项目使用现有的B-IB自动测试设备(ATE)。C-17的决定与空军强调减少独特ATE的扩散是一致的。ATE的选择是在考虑了成本、性能和可支持性权衡之后做出的。在不影响现有硬件和软件配置的情况下,需要最小限度地增加政府库存设备。这种方法大大降低了C-17项目的ATE开发成本,并为该项目提供了既定的后勤要素和支持结构。C-17项目要求支持结构和飞机开发的并发性,ATE解决方案通过将测试项目集开发和空军操作和训练需求的风险降低到可管理的水平来满足这一需求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
C-17, successful application of existing automatic test equipment
The C-17 Program utilizes existing B-IB Automatic Test Equipment (ATE). The C-17 decision is in harmony with the Air Force emphasis on reducing proliferation of unique ATE. The ATE selection was made after consideration of cost, performance and supportability tradeoffs. Minimal augmentation of the government inventoried equipment was required which did not affect the existing hardware and software configuration. This approach significantly reduced C-17 program ATE development costs and afforded the program the use of established logistics elements and support structure. The C-17 program demanded concurrency of support structure and aircraft development-the ATE solution met that demand by reducing risks to a manageable level for both test program set development, and Air Force operation and training requirements.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信