{"title":"无水泥等待(No WOC)技术成功应用于Pertamina Hulu Mahakam (PHM),显著节省了钻井时间","authors":"H. S. Sinaga","doi":"10.29118/ipa20-e-301","DOIUrl":null,"url":null,"abstract":"As the new operator of the Mahakam Block started in 2017, Pertamina Hulu Mahakam (PHM) were challenged to ramp up operations in order to combat massive production decline. At the same time, reducing well cost was also a paramount importance to ensure that the economic targets of the wells were achieved following the reduction of well stakes. One of the remaining unsolved enigmas is how to achieve No Wait-on-Cement (NO WOC) on surface diverter section as this will create a lot of rig time saving both on single well and batch operations. The project begins with several different kinds of proposal until the best solutions were identified fulfilling safety, simplicity of operations and acceptable cost and finally were put in place with very satisfying results. The main key principle is conversion wellhead stages following well architecture while there were several modifications of casing hanger, adapter, additional materials & modified procedure. Rig time saving, additional operational gain and a promising new “breakthrough” of drilling technique become a significant impact of the successful effort. Now the method has become a standard in PHM operations and has already been integrated to SDI (Standard Drilling Instruction). The merit of this endless hard work could possibly be gained by other operators as it will create more added values both tangible and intangible.","PeriodicalId":269847,"journal":{"name":"Proc. Indon. Petrol. Assoc., Digital Technical Conference, 2020","volume":"71 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"No Wait-On-Cement (NO WOC) Successfully Applied in Pertamina Hulu Mahakam (PHM) and Creating Significant Well Rig Time Saving\",\"authors\":\"H. S. Sinaga\",\"doi\":\"10.29118/ipa20-e-301\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As the new operator of the Mahakam Block started in 2017, Pertamina Hulu Mahakam (PHM) were challenged to ramp up operations in order to combat massive production decline. At the same time, reducing well cost was also a paramount importance to ensure that the economic targets of the wells were achieved following the reduction of well stakes. One of the remaining unsolved enigmas is how to achieve No Wait-on-Cement (NO WOC) on surface diverter section as this will create a lot of rig time saving both on single well and batch operations. The project begins with several different kinds of proposal until the best solutions were identified fulfilling safety, simplicity of operations and acceptable cost and finally were put in place with very satisfying results. The main key principle is conversion wellhead stages following well architecture while there were several modifications of casing hanger, adapter, additional materials & modified procedure. Rig time saving, additional operational gain and a promising new “breakthrough” of drilling technique become a significant impact of the successful effort. Now the method has become a standard in PHM operations and has already been integrated to SDI (Standard Drilling Instruction). The merit of this endless hard work could possibly be gained by other operators as it will create more added values both tangible and intangible.\",\"PeriodicalId\":269847,\"journal\":{\"name\":\"Proc. Indon. Petrol. Assoc., Digital Technical Conference, 2020\",\"volume\":\"71 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proc. Indon. Petrol. Assoc., Digital Technical Conference, 2020\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29118/ipa20-e-301\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proc. Indon. Petrol. Assoc., Digital Technical Conference, 2020","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29118/ipa20-e-301","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
随着Mahakam区块的新运营商于2017年开始运营,Pertamina Hulu Mahakam (PHM)面临着增加运营以应对产量大幅下降的挑战。与此同时,降低井成本对于确保在降低井赌注后实现井的经济目标也至关重要。目前仍未解决的难题之一是如何在地面暂堵剂段实现No Wait-on-Cement (No WOC),因为这将节省大量单井和批量作业的钻机时间。该项目开始时提出了几种不同的建议,直到确定了满足安全性、操作简单性和可接受成本的最佳解决方案,并最终实施,取得了非常令人满意的结果。主要的关键原则是根据井结构转换井口级,同时对套管悬挂器、适配器、附加材料和修改程序进行了多次修改。钻井时间的节省、额外的作业收益以及钻井技术的新“突破”将成为成功的重要影响因素。现在,该方法已成为PHM作业的标准,并已集成到SDI(标准钻井指令)中。这种无休止的辛勤工作的优点可能会被其他运营商所获得,因为它将创造更多的有形和无形的附加价值。
No Wait-On-Cement (NO WOC) Successfully Applied in Pertamina Hulu Mahakam (PHM) and Creating Significant Well Rig Time Saving
As the new operator of the Mahakam Block started in 2017, Pertamina Hulu Mahakam (PHM) were challenged to ramp up operations in order to combat massive production decline. At the same time, reducing well cost was also a paramount importance to ensure that the economic targets of the wells were achieved following the reduction of well stakes. One of the remaining unsolved enigmas is how to achieve No Wait-on-Cement (NO WOC) on surface diverter section as this will create a lot of rig time saving both on single well and batch operations. The project begins with several different kinds of proposal until the best solutions were identified fulfilling safety, simplicity of operations and acceptable cost and finally were put in place with very satisfying results. The main key principle is conversion wellhead stages following well architecture while there were several modifications of casing hanger, adapter, additional materials & modified procedure. Rig time saving, additional operational gain and a promising new “breakthrough” of drilling technique become a significant impact of the successful effort. Now the method has become a standard in PHM operations and has already been integrated to SDI (Standard Drilling Instruction). The merit of this endless hard work could possibly be gained by other operators as it will create more added values both tangible and intangible.