Christian Weckenborg, Karsten Kieckhäfer, T. Spengler, Patricia Bernstein
{"title":"大众汽车预生产中心应用运筹学优化产能调度","authors":"Christian Weckenborg, Karsten Kieckhäfer, T. Spengler, Patricia Bernstein","doi":"10.1287/inte.2020.1029","DOIUrl":null,"url":null,"abstract":"The Volkswagen Pre-Production Center (VPC) is responsible for the entire prototype assembly of the Volkswagen brand. In their assembly sites, however, they often cannot employ their manufacturing s...","PeriodicalId":430990,"journal":{"name":"INFORMS J. Appl. Anal.","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-03-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"The Volkswagen Pre-Production Center Applies Operations Research to Optimize Capacity Scheduling\",\"authors\":\"Christian Weckenborg, Karsten Kieckhäfer, T. Spengler, Patricia Bernstein\",\"doi\":\"10.1287/inte.2020.1029\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Volkswagen Pre-Production Center (VPC) is responsible for the entire prototype assembly of the Volkswagen brand. In their assembly sites, however, they often cannot employ their manufacturing s...\",\"PeriodicalId\":430990,\"journal\":{\"name\":\"INFORMS J. Appl. Anal.\",\"volume\":\"28 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-03-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"INFORMS J. Appl. Anal.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1287/inte.2020.1029\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"INFORMS J. Appl. Anal.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1287/inte.2020.1029","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The Volkswagen Pre-Production Center Applies Operations Research to Optimize Capacity Scheduling
The Volkswagen Pre-Production Center (VPC) is responsible for the entire prototype assembly of the Volkswagen brand. In their assembly sites, however, they often cannot employ their manufacturing s...