{"title":"模块化施工方法在建筑中的应用:优势与障碍","authors":"Chuwei Chen","doi":"10.1680/jsmic.22.00017","DOIUrl":null,"url":null,"abstract":"This study aims to investigate the advantages and barriers of modular construction method that could facilitate the leverage of this method in practice by effectively overcoming barriers in the process. Three typical modular construction cases: Leishenshan Hospital in Wuhan, media residence hotel for the 2018 Winter Olympic Games in Pyeong-Chang and Global Academy in Hayes, were selected and analysed. Findings show that modular construction method can shorten construction time, facilitate collaborations between stakeholders, enable effective management, save labors and costs, reduce waste, and minimize impacts on local community. The eco-friendly design allows the modular buildings to be recycled or relocated for some other use purposes. The engagement of current engineering technologies upgrades the construction quality and enhances the project management. It is expected that modular design and construction would be an appropriate option to construct multifunctional buildings, particularly for short-term events or in some urgent circumstances. On the other hand, it is suggested that more effective logistic approaches should be used to transport modules to the site and new technologies focusing on flexibly resizing or reshaping modules could be developed. The modular technology is expected to be employed in constructing more permanent buildings by improving the quality and sustainability.","PeriodicalId":371248,"journal":{"name":"Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Application of modular construction method to constructing buildings: advantages and barriers\",\"authors\":\"Chuwei Chen\",\"doi\":\"10.1680/jsmic.22.00017\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study aims to investigate the advantages and barriers of modular construction method that could facilitate the leverage of this method in practice by effectively overcoming barriers in the process. Three typical modular construction cases: Leishenshan Hospital in Wuhan, media residence hotel for the 2018 Winter Olympic Games in Pyeong-Chang and Global Academy in Hayes, were selected and analysed. Findings show that modular construction method can shorten construction time, facilitate collaborations between stakeholders, enable effective management, save labors and costs, reduce waste, and minimize impacts on local community. The eco-friendly design allows the modular buildings to be recycled or relocated for some other use purposes. The engagement of current engineering technologies upgrades the construction quality and enhances the project management. It is expected that modular design and construction would be an appropriate option to construct multifunctional buildings, particularly for short-term events or in some urgent circumstances. On the other hand, it is suggested that more effective logistic approaches should be used to transport modules to the site and new technologies focusing on flexibly resizing or reshaping modules could be developed. The modular technology is expected to be employed in constructing more permanent buildings by improving the quality and sustainability.\",\"PeriodicalId\":371248,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-04-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jsmic.22.00017\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jsmic.22.00017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究旨在探讨模块化施工方法的优势和障碍,通过有效克服过程中的障碍,促进模块化施工方法在实践中的发挥作用。选取武汉雷神山医院、2018平昌冬奥会媒体住宅酒店、海耶斯环球学院三个典型的模块化建设案例进行分析。研究结果表明,模块化施工方法可以缩短施工时间,促进利益相关者之间的合作,实现有效的管理,节省劳动力和成本,减少浪费,并最大限度地减少对当地社区的影响。生态友好的设计使模块化建筑可以回收利用或重新安置用于其他用途。现代工程技术的应用提高了施工质量,加强了项目管理。预计模块化设计和建造将是建造多功能建筑物的适当选择,特别是在短期活动或某些紧急情况下。另一方面,建议采用更有效的物流方式将模块运送到现场,并开发灵活调整或重塑模块的新技术。模块化技术有望通过提高质量和可持续性,用于建造更多的永久性建筑。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Application of modular construction method to constructing buildings: advantages and barriers
This study aims to investigate the advantages and barriers of modular construction method that could facilitate the leverage of this method in practice by effectively overcoming barriers in the process. Three typical modular construction cases: Leishenshan Hospital in Wuhan, media residence hotel for the 2018 Winter Olympic Games in Pyeong-Chang and Global Academy in Hayes, were selected and analysed. Findings show that modular construction method can shorten construction time, facilitate collaborations between stakeholders, enable effective management, save labors and costs, reduce waste, and minimize impacts on local community. The eco-friendly design allows the modular buildings to be recycled or relocated for some other use purposes. The engagement of current engineering technologies upgrades the construction quality and enhances the project management. It is expected that modular design and construction would be an appropriate option to construct multifunctional buildings, particularly for short-term events or in some urgent circumstances. On the other hand, it is suggested that more effective logistic approaches should be used to transport modules to the site and new technologies focusing on flexibly resizing or reshaping modules could be developed. The modular technology is expected to be employed in constructing more permanent buildings by improving the quality and sustainability.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
2.70
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信