M. Janné, A. Fredriksson, M. Billger, N. Brusselaers, S. M. Fufa, Rodrigue Al Fahel, K. Mommens
{"title":"智慧建筑物流治理:城市发展中的建筑物流系统观","authors":"M. Janné, A. Fredriksson, M. Billger, N. Brusselaers, S. M. Fufa, Rodrigue Al Fahel, K. Mommens","doi":"10.47472/cnkiaufi","DOIUrl":null,"url":null,"abstract":"To reduce disturbances and impact from construction transports during urban development, logistics flows need to be managed and controlled efficiently. One way to do so is using construction logistics setups. However, these rarely take both initiator and end-user perspectives into consideration. The paper builds on a longitudinal multiple-case study with cases from Belgium, Norway, and Sweden. The cases provide insights on different tools and approaches for gathering stakeholder input, simulation and forecasting of transport volumes, what type of services are needed in urban construction projects, and different governance measures and incentives. A cross-case analysis was performed to find similarities and differences between the countries. The result of the study is a conceptual framework, presenting a systems overview of the decision routes in urban development linked to construction logistics.","PeriodicalId":254023,"journal":{"name":"Proceedings of the 57th ISOCARP World Planning Congress","volume":"96 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Smart Construction Logistics Governance A systems view of construction logistics in urban development\",\"authors\":\"M. Janné, A. Fredriksson, M. Billger, N. Brusselaers, S. M. Fufa, Rodrigue Al Fahel, K. Mommens\",\"doi\":\"10.47472/cnkiaufi\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To reduce disturbances and impact from construction transports during urban development, logistics flows need to be managed and controlled efficiently. One way to do so is using construction logistics setups. However, these rarely take both initiator and end-user perspectives into consideration. The paper builds on a longitudinal multiple-case study with cases from Belgium, Norway, and Sweden. The cases provide insights on different tools and approaches for gathering stakeholder input, simulation and forecasting of transport volumes, what type of services are needed in urban construction projects, and different governance measures and incentives. A cross-case analysis was performed to find similarities and differences between the countries. The result of the study is a conceptual framework, presenting a systems overview of the decision routes in urban development linked to construction logistics.\",\"PeriodicalId\":254023,\"journal\":{\"name\":\"Proceedings of the 57th ISOCARP World Planning Congress\",\"volume\":\"96 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 57th ISOCARP World Planning Congress\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47472/cnkiaufi\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 57th ISOCARP World Planning Congress","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47472/cnkiaufi","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Smart Construction Logistics Governance A systems view of construction logistics in urban development
To reduce disturbances and impact from construction transports during urban development, logistics flows need to be managed and controlled efficiently. One way to do so is using construction logistics setups. However, these rarely take both initiator and end-user perspectives into consideration. The paper builds on a longitudinal multiple-case study with cases from Belgium, Norway, and Sweden. The cases provide insights on different tools and approaches for gathering stakeholder input, simulation and forecasting of transport volumes, what type of services are needed in urban construction projects, and different governance measures and incentives. A cross-case analysis was performed to find similarities and differences between the countries. The result of the study is a conceptual framework, presenting a systems overview of the decision routes in urban development linked to construction logistics.