智慧建筑物流治理:城市发展中的建筑物流系统观

M. Janné, A. Fredriksson, M. Billger, N. Brusselaers, S. M. Fufa, Rodrigue Al Fahel, K. Mommens
{"title":"智慧建筑物流治理:城市发展中的建筑物流系统观","authors":"M. Janné, A. Fredriksson, M. Billger, N. Brusselaers, S. M. Fufa, Rodrigue Al Fahel, K. Mommens","doi":"10.47472/cnkiaufi","DOIUrl":null,"url":null,"abstract":"To reduce disturbances and impact from construction transports during urban development, logistics flows need to be managed and controlled efficiently. One way to do so is using construction logistics setups. However, these rarely take both initiator and end-user perspectives into consideration. The paper builds on a longitudinal multiple-case study with cases from Belgium, Norway, and Sweden. The cases provide insights on different tools and approaches for gathering stakeholder input, simulation and forecasting of transport volumes, what type of services are needed in urban construction projects, and different governance measures and incentives. A cross-case analysis was performed to find similarities and differences between the countries. The result of the study is a conceptual framework, presenting a systems overview of the decision routes in urban development linked to construction logistics.","PeriodicalId":254023,"journal":{"name":"Proceedings of the 57th ISOCARP World Planning Congress","volume":"96 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Smart Construction Logistics Governance A systems view of construction logistics in urban development\",\"authors\":\"M. Janné, A. Fredriksson, M. Billger, N. Brusselaers, S. M. Fufa, Rodrigue Al Fahel, K. Mommens\",\"doi\":\"10.47472/cnkiaufi\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To reduce disturbances and impact from construction transports during urban development, logistics flows need to be managed and controlled efficiently. One way to do so is using construction logistics setups. However, these rarely take both initiator and end-user perspectives into consideration. The paper builds on a longitudinal multiple-case study with cases from Belgium, Norway, and Sweden. The cases provide insights on different tools and approaches for gathering stakeholder input, simulation and forecasting of transport volumes, what type of services are needed in urban construction projects, and different governance measures and incentives. A cross-case analysis was performed to find similarities and differences between the countries. The result of the study is a conceptual framework, presenting a systems overview of the decision routes in urban development linked to construction logistics.\",\"PeriodicalId\":254023,\"journal\":{\"name\":\"Proceedings of the 57th ISOCARP World Planning Congress\",\"volume\":\"96 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 57th ISOCARP World Planning Congress\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47472/cnkiaufi\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 57th ISOCARP World Planning Congress","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47472/cnkiaufi","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

为了减少城市发展过程中建筑运输的干扰和影响,需要对物流进行有效的管理和控制。这样做的一种方法是使用建筑物流设备。然而,这些很少考虑发起者和最终用户的观点。该论文建立在对比利时、挪威和瑞典的案例进行纵向多案例研究的基础上。这些案例为收集利益相关者意见、模拟和预测交通量、城市建设项目需要哪种类型的服务以及不同的治理措施和激励措施提供了不同的工具和方法。进行了跨案例分析,以找出各国之间的异同。研究的结果是一个概念框架,提出了与建筑物流相关的城市发展决策路线的系统概述。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Smart Construction Logistics Governance A systems view of construction logistics in urban development
To reduce disturbances and impact from construction transports during urban development, logistics flows need to be managed and controlled efficiently. One way to do so is using construction logistics setups. However, these rarely take both initiator and end-user perspectives into consideration. The paper builds on a longitudinal multiple-case study with cases from Belgium, Norway, and Sweden. The cases provide insights on different tools and approaches for gathering stakeholder input, simulation and forecasting of transport volumes, what type of services are needed in urban construction projects, and different governance measures and incentives. A cross-case analysis was performed to find similarities and differences between the countries. The result of the study is a conceptual framework, presenting a systems overview of the decision routes in urban development linked to construction logistics.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信