{"title":"Implеmеntаciја i rаzvој prаvilа zа priklјučеnjе gеnеrаtоrskih јеdinicа kоје su prеkо invеrtоrа pоvеzаnе nа mrеžu u Nemačkoj","authors":"Stаnkо Јаnkоvić, Bојаn Ivаnоvić","doi":"10.46793/eee21-4.59j","DOIUrl":null,"url":null,"abstract":"The authors review the development of unconventional power generation units in Germany in the last 10 years with a view to possible scenarios in 2035 and 2040. The dynamic development of production from renewable energy sources led to the fact that in some parts of Germany the plan for the production of electricity from renewable sources for 2025 was reached in 2011. Bearing in mind that about 97% of all renewable energy production units are connected to distribution networks, the question of operational production management arises. The paper presents technical solutions for the management of production from renewable sources, as well as the necessary technical requirements for the connection of generator units that are connected to the grid via inverters in order to preserve the stability of the power system.","PeriodicalId":236996,"journal":{"name":"Energija, ekonomija, ekologija","volume":"61 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energija, ekonomija, ekologija","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46793/eee21-4.59j","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Implеmеntаciја i rаzvој prаvilа zа priklјučеnjе gеnеrаtоrskih јеdinicа kоје su prеkо invеrtоrа pоvеzаnе nа mrеžu u Nemačkoj
The authors review the development of unconventional power generation units in Germany in the last 10 years with a view to possible scenarios in 2035 and 2040. The dynamic development of production from renewable energy sources led to the fact that in some parts of Germany the plan for the production of electricity from renewable sources for 2025 was reached in 2011. Bearing in mind that about 97% of all renewable energy production units are connected to distribution networks, the question of operational production management arises. The paper presents technical solutions for the management of production from renewable sources, as well as the necessary technical requirements for the connection of generator units that are connected to the grid via inverters in order to preserve the stability of the power system.