Mohd Fisal Ishak, K. Alauddin, Mohd Nurul Hafiz Ibrahim
{"title":"马来西亚建筑行业的延迟和不付款问题:建筑材料供应商的观点","authors":"Mohd Fisal Ishak, K. Alauddin, Mohd Nurul Hafiz Ibrahim","doi":"10.24191/myse.v6i1.8674","DOIUrl":null,"url":null,"abstract":"Payment in the Malaysian construction industry has generally been an issue of concern. Late and non-payment problem is endemic in construction and needs to be addressed. The aim of this study is to investigate the issues related to late and non-payment based on the building materials suppliers’ perspective. Questionnaires were distributed to suppliers of building materials in the Klang Valley. Findings from the study shows the main cause of late and non-payment is the paymaster’s poor financial management while the main effect of late and non-payment is problem with the cash flow. The most recommended possible solution to cope with the issue is for the paymaster to conduct training on financial and cash flow management to the management team in the company. \n ","PeriodicalId":194704,"journal":{"name":"Malaysian Journal of Sustainable Environment","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"LATE AND NON-PAYMENTS ISSUES IN THE MALAYSIAN CONSTRUCTION INDUSTRY: PERSPECTIVE OF BUILDING MATERIAL SUPPLIERS\",\"authors\":\"Mohd Fisal Ishak, K. Alauddin, Mohd Nurul Hafiz Ibrahim\",\"doi\":\"10.24191/myse.v6i1.8674\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Payment in the Malaysian construction industry has generally been an issue of concern. Late and non-payment problem is endemic in construction and needs to be addressed. The aim of this study is to investigate the issues related to late and non-payment based on the building materials suppliers’ perspective. Questionnaires were distributed to suppliers of building materials in the Klang Valley. Findings from the study shows the main cause of late and non-payment is the paymaster’s poor financial management while the main effect of late and non-payment is problem with the cash flow. The most recommended possible solution to cope with the issue is for the paymaster to conduct training on financial and cash flow management to the management team in the company. \\n \",\"PeriodicalId\":194704,\"journal\":{\"name\":\"Malaysian Journal of Sustainable Environment\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-04-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Malaysian Journal of Sustainable Environment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24191/myse.v6i1.8674\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Malaysian Journal of Sustainable Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24191/myse.v6i1.8674","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
LATE AND NON-PAYMENTS ISSUES IN THE MALAYSIAN CONSTRUCTION INDUSTRY: PERSPECTIVE OF BUILDING MATERIAL SUPPLIERS
Payment in the Malaysian construction industry has generally been an issue of concern. Late and non-payment problem is endemic in construction and needs to be addressed. The aim of this study is to investigate the issues related to late and non-payment based on the building materials suppliers’ perspective. Questionnaires were distributed to suppliers of building materials in the Klang Valley. Findings from the study shows the main cause of late and non-payment is the paymaster’s poor financial management while the main effect of late and non-payment is problem with the cash flow. The most recommended possible solution to cope with the issue is for the paymaster to conduct training on financial and cash flow management to the management team in the company.