Joshua Yip, S. Santoso, M. Garcia, B. Pierre, E. Kutanoglu
{"title":"黑启动恢复的最优移动储能预布局","authors":"Joshua Yip, S. Santoso, M. Garcia, B. Pierre, E. Kutanoglu","doi":"10.1109/EESAT55007.2022.9998030","DOIUrl":null,"url":null,"abstract":"This paper studies a novel mixed-integer linear programming (MILP) formulation on the pre-blackout placement of mobile energy storage (MES) for black-start (BS) restoration of a transmission network. The formulation is a stochastic program that, rather than re-energization over a multi-interval horizon, for each scenario considers the final energization states of generators in a steady-state power flow. If a scenario of the event inducing the blackout cuts off an island from the network, the island is re-energized following the blackout only if it contains a generator with either BS capability or a pre-placed MES. Besides the model, this paper also explores the novel analytical concept of a discretized expected value realization.","PeriodicalId":310250,"journal":{"name":"2022 IEEE Electrical Energy Storage Application and Technologies Conference (EESAT)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimal Mobile Energy Storage Pre-Placement for Black-Start Restoration\",\"authors\":\"Joshua Yip, S. Santoso, M. Garcia, B. Pierre, E. Kutanoglu\",\"doi\":\"10.1109/EESAT55007.2022.9998030\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper studies a novel mixed-integer linear programming (MILP) formulation on the pre-blackout placement of mobile energy storage (MES) for black-start (BS) restoration of a transmission network. The formulation is a stochastic program that, rather than re-energization over a multi-interval horizon, for each scenario considers the final energization states of generators in a steady-state power flow. If a scenario of the event inducing the blackout cuts off an island from the network, the island is re-energized following the blackout only if it contains a generator with either BS capability or a pre-placed MES. Besides the model, this paper also explores the novel analytical concept of a discretized expected value realization.\",\"PeriodicalId\":310250,\"journal\":{\"name\":\"2022 IEEE Electrical Energy Storage Application and Technologies Conference (EESAT)\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 IEEE Electrical Energy Storage Application and Technologies Conference (EESAT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EESAT55007.2022.9998030\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE Electrical Energy Storage Application and Technologies Conference (EESAT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EESAT55007.2022.9998030","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Optimal Mobile Energy Storage Pre-Placement for Black-Start Restoration
This paper studies a novel mixed-integer linear programming (MILP) formulation on the pre-blackout placement of mobile energy storage (MES) for black-start (BS) restoration of a transmission network. The formulation is a stochastic program that, rather than re-energization over a multi-interval horizon, for each scenario considers the final energization states of generators in a steady-state power flow. If a scenario of the event inducing the blackout cuts off an island from the network, the island is re-energized following the blackout only if it contains a generator with either BS capability or a pre-placed MES. Besides the model, this paper also explores the novel analytical concept of a discretized expected value realization.