生产管理模式,以减少周期时间在一个公司在金属加工部门使用精益制造

Erick Hanson Bolaños Valencia, Yeimy Salvatierra García, Grimaldo Quispe Santivañez, Elva Castañeda
{"title":"生产管理模式,以减少周期时间在一个公司在金属加工部门使用精益制造","authors":"Erick Hanson Bolaños Valencia, Yeimy Salvatierra García, Grimaldo Quispe Santivañez, Elva Castañeda","doi":"10.1109/ICIM56520.2022.00040","DOIUrl":null,"url":null,"abstract":"The purpose of this research is to address one of the most frequent problems of the metalworking sector companies which processes present high variability due to a bad management of their setup times. In this sense, a four-phase management model based on lean manufacturing was developed by applying VSM and SMED. This model was validated in a metalworking SME, specifically in its welding process, which achieved a reduction of 87.7% in preparation time, 3% in cycle time and 4.2% in production capacity.","PeriodicalId":391964,"journal":{"name":"2022 8th International Conference on Information Management (ICIM)","volume":"136 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Production Management Model to Reduce Cycle Times Using Lean Manufacturing in a Company in the Metalworking Sector\",\"authors\":\"Erick Hanson Bolaños Valencia, Yeimy Salvatierra García, Grimaldo Quispe Santivañez, Elva Castañeda\",\"doi\":\"10.1109/ICIM56520.2022.00040\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of this research is to address one of the most frequent problems of the metalworking sector companies which processes present high variability due to a bad management of their setup times. In this sense, a four-phase management model based on lean manufacturing was developed by applying VSM and SMED. This model was validated in a metalworking SME, specifically in its welding process, which achieved a reduction of 87.7% in preparation time, 3% in cycle time and 4.2% in production capacity.\",\"PeriodicalId\":391964,\"journal\":{\"name\":\"2022 8th International Conference on Information Management (ICIM)\",\"volume\":\"136 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 8th International Conference on Information Management (ICIM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICIM56520.2022.00040\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 8th International Conference on Information Management (ICIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIM56520.2022.00040","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究的目的是解决金属加工部门公司最常见的问题之一,由于其设置时间管理不善,加工过程呈现高度可变性。在此基础上,运用VSM和SMED建立了一个基于精益制造的四阶段管理模型。该模型在一家金属加工中小企业中得到了验证,特别是在其焊接过程中,其准备时间减少了87.7%,周期时间减少了3%,生产能力减少了4.2%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Production Management Model to Reduce Cycle Times Using Lean Manufacturing in a Company in the Metalworking Sector
The purpose of this research is to address one of the most frequent problems of the metalworking sector companies which processes present high variability due to a bad management of their setup times. In this sense, a four-phase management model based on lean manufacturing was developed by applying VSM and SMED. This model was validated in a metalworking SME, specifically in its welding process, which achieved a reduction of 87.7% in preparation time, 3% in cycle time and 4.2% in production capacity.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信