Salihu Zaharaddeen Kado, R. Ibrahim, Khairul Anwar Mohamed khaidzir
{"title":"基于Agent的仿真模型开发中用于构建顾问团队的Agent参数","authors":"Salihu Zaharaddeen Kado, R. Ibrahim, Khairul Anwar Mohamed khaidzir","doi":"10.1109/ISTMET.2014.6936508","DOIUrl":null,"url":null,"abstract":"Managing information within building construction activities is a challenging task, particularly when each phases of the building construction involves various types of stakeholders (architects, mechanical, electrical and civil engineers, as well as quantity surveyors). In the planning phase of a construction projects, the architects initiate a project through the design of a building. The design artifact produced by architects is among the examples of the initial information that needs to be delivered to the other stakeholders (such as the engineers). However, the process of disseminating this information involves the complex interaction and iteration of activities. This paper discusses the preliminary work undertaken to extract the parameters involved in building consultant teamwork. We used a thematic analysis approach to identify the parameters for the subsequent development of an agent-based simulation model which simulates the interactions among the stakeholders involved. We validate the identified agent parameters with construction experts and with readings obtained from an Nvivo software report.","PeriodicalId":364834,"journal":{"name":"2014 International Symposium on Technology Management and Emerging Technologies","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Agent parameters for building consultant teamwork in the agent-based simulation model development\",\"authors\":\"Salihu Zaharaddeen Kado, R. Ibrahim, Khairul Anwar Mohamed khaidzir\",\"doi\":\"10.1109/ISTMET.2014.6936508\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Managing information within building construction activities is a challenging task, particularly when each phases of the building construction involves various types of stakeholders (architects, mechanical, electrical and civil engineers, as well as quantity surveyors). In the planning phase of a construction projects, the architects initiate a project through the design of a building. The design artifact produced by architects is among the examples of the initial information that needs to be delivered to the other stakeholders (such as the engineers). However, the process of disseminating this information involves the complex interaction and iteration of activities. This paper discusses the preliminary work undertaken to extract the parameters involved in building consultant teamwork. We used a thematic analysis approach to identify the parameters for the subsequent development of an agent-based simulation model which simulates the interactions among the stakeholders involved. We validate the identified agent parameters with construction experts and with readings obtained from an Nvivo software report.\",\"PeriodicalId\":364834,\"journal\":{\"name\":\"2014 International Symposium on Technology Management and Emerging Technologies\",\"volume\":\"73 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-05-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 International Symposium on Technology Management and Emerging Technologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISTMET.2014.6936508\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 International Symposium on Technology Management and Emerging Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISTMET.2014.6936508","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Agent parameters for building consultant teamwork in the agent-based simulation model development
Managing information within building construction activities is a challenging task, particularly when each phases of the building construction involves various types of stakeholders (architects, mechanical, electrical and civil engineers, as well as quantity surveyors). In the planning phase of a construction projects, the architects initiate a project through the design of a building. The design artifact produced by architects is among the examples of the initial information that needs to be delivered to the other stakeholders (such as the engineers). However, the process of disseminating this information involves the complex interaction and iteration of activities. This paper discusses the preliminary work undertaken to extract the parameters involved in building consultant teamwork. We used a thematic analysis approach to identify the parameters for the subsequent development of an agent-based simulation model which simulates the interactions among the stakeholders involved. We validate the identified agent parameters with construction experts and with readings obtained from an Nvivo software report.