{"title":"基于钻井数据的复杂等高线三角形瓦片重建","authors":"X. Mao, Wen-fa Shan, Xiao-qin Lu, Zhi-qiang Xu","doi":"10.1109/CISE.2010.5677212","DOIUrl":null,"url":null,"abstract":"This paper expounds the 3D reconstruction of triangle tiles from complex contours based on drill data. Focusing on some existing problems and crucial techniques such as calculation of centroid, identical manipulation toward directions of contours, embranchment treatment, and finding of relatively optimized 3D surfaces, a detailed solution is put forward. The experiment result and the feasibility of the 3D modeling method are presented.","PeriodicalId":232832,"journal":{"name":"2010 International Conference on Computational Intelligence and Software Engineering","volume":"123 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Triangle Tiles Reconstruction from Complex Contours Based on Drill Data\",\"authors\":\"X. Mao, Wen-fa Shan, Xiao-qin Lu, Zhi-qiang Xu\",\"doi\":\"10.1109/CISE.2010.5677212\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper expounds the 3D reconstruction of triangle tiles from complex contours based on drill data. Focusing on some existing problems and crucial techniques such as calculation of centroid, identical manipulation toward directions of contours, embranchment treatment, and finding of relatively optimized 3D surfaces, a detailed solution is put forward. The experiment result and the feasibility of the 3D modeling method are presented.\",\"PeriodicalId\":232832,\"journal\":{\"name\":\"2010 International Conference on Computational Intelligence and Software Engineering\",\"volume\":\"123 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-12-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Conference on Computational Intelligence and Software Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CISE.2010.5677212\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Computational Intelligence and Software Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CISE.2010.5677212","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Triangle Tiles Reconstruction from Complex Contours Based on Drill Data
This paper expounds the 3D reconstruction of triangle tiles from complex contours based on drill data. Focusing on some existing problems and crucial techniques such as calculation of centroid, identical manipulation toward directions of contours, embranchment treatment, and finding of relatively optimized 3D surfaces, a detailed solution is put forward. The experiment result and the feasibility of the 3D modeling method are presented.