{"title":"仿真网格中交互式任务调度的遗传算法","authors":"Huang Hai, Tian Lei, Wu Wei, Songlin Sun, Xiaojun Jing","doi":"10.1109/ICIE.2010.15","DOIUrl":null,"url":null,"abstract":"Scheduling plays an important role of mapping interactive simulation tasks onto heterogeneous computing nodes in simulation grid. A multi-objective multi-constrained task scheduling model was established considering the consumption of task load, message interaction between tasks, load of computing nodes, and communication delay. And the problem was solved on basis of genetic algorithm. The experimental results show that the proposed method is feasible.","PeriodicalId":353239,"journal":{"name":"2010 WASE International Conference on Information Engineering","volume":"77 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-08-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Genetic Algorithm for Scheduling of Interactive Tasks in Simulation Grid\",\"authors\":\"Huang Hai, Tian Lei, Wu Wei, Songlin Sun, Xiaojun Jing\",\"doi\":\"10.1109/ICIE.2010.15\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Scheduling plays an important role of mapping interactive simulation tasks onto heterogeneous computing nodes in simulation grid. A multi-objective multi-constrained task scheduling model was established considering the consumption of task load, message interaction between tasks, load of computing nodes, and communication delay. And the problem was solved on basis of genetic algorithm. The experimental results show that the proposed method is feasible.\",\"PeriodicalId\":353239,\"journal\":{\"name\":\"2010 WASE International Conference on Information Engineering\",\"volume\":\"77 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-08-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 WASE International Conference on Information Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICIE.2010.15\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 WASE International Conference on Information Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIE.2010.15","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Genetic Algorithm for Scheduling of Interactive Tasks in Simulation Grid
Scheduling plays an important role of mapping interactive simulation tasks onto heterogeneous computing nodes in simulation grid. A multi-objective multi-constrained task scheduling model was established considering the consumption of task load, message interaction between tasks, load of computing nodes, and communication delay. And the problem was solved on basis of genetic algorithm. The experimental results show that the proposed method is feasible.