{"title":"波兰电力系统370mw额定机组动力机械可靠性指标估算","authors":"J. Buchta, A. Oziemski","doi":"10.1109/EPQU.2011.6128885","DOIUrl":null,"url":null,"abstract":"The paper presents results of reliability forecasting for domestic, technologically congener power units rated at 370 MW operating in Belchatow Power Plant and Opole Power Plant as lignite fired and hard coal fired respectively. Estimation of parameters for identified empirical probability distribution functions of operation time and repair time was done by the method of a histogram with a set number of observations in each class. The study includes expected values of reliability indices calculated for main generating installations of both unit types.","PeriodicalId":369941,"journal":{"name":"11th International Conference on Electrical Power Quality and Utilisation","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Estimation of reliability indices of power machinery in 370 MW rated power units operating in polish power system\",\"authors\":\"J. Buchta, A. Oziemski\",\"doi\":\"10.1109/EPQU.2011.6128885\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper presents results of reliability forecasting for domestic, technologically congener power units rated at 370 MW operating in Belchatow Power Plant and Opole Power Plant as lignite fired and hard coal fired respectively. Estimation of parameters for identified empirical probability distribution functions of operation time and repair time was done by the method of a histogram with a set number of observations in each class. The study includes expected values of reliability indices calculated for main generating installations of both unit types.\",\"PeriodicalId\":369941,\"journal\":{\"name\":\"11th International Conference on Electrical Power Quality and Utilisation\",\"volume\":\"25 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"11th International Conference on Electrical Power Quality and Utilisation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPQU.2011.6128885\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th International Conference on Electrical Power Quality and Utilisation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPQU.2011.6128885","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Estimation of reliability indices of power machinery in 370 MW rated power units operating in polish power system
The paper presents results of reliability forecasting for domestic, technologically congener power units rated at 370 MW operating in Belchatow Power Plant and Opole Power Plant as lignite fired and hard coal fired respectively. Estimation of parameters for identified empirical probability distribution functions of operation time and repair time was done by the method of a histogram with a set number of observations in each class. The study includes expected values of reliability indices calculated for main generating installations of both unit types.