在低压馈线上实施1kv:解决低压系统电压下降问题的中压线路投资的智能替代方案

Kadir Özen, M. E. Cebeci, O. B. Tör, Gökhan Batar, Andaç Kiliç, Ülfet Türkmen, A. Güven
{"title":"在低压馈线上实施1kv:解决低压系统电压下降问题的中压线路投资的智能替代方案","authors":"Kadir Özen, M. E. Cebeci, O. B. Tör, Gökhan Batar, Andaç Kiliç, Ülfet Türkmen, A. Güven","doi":"10.1109/SGCF.2017.7947630","DOIUrl":null,"url":null,"abstract":"This paper presents methodology and on-site pilot implementation of utilizing 1 kV at low voltage (LV) feeders as an alternative to medium voltage (MV) line investments to solve voltage drop problems at LV systems. Typically distribution companies solve voltage drop problems of LV system by installing a new MV/LV transformer and transferring outmost loads of the existing transformer to the new transformer. This necessitates installation of MV line between the existing and new transformer. The implementation of 1 kV on the existing LV lines eliminates the need for MV line investment. It can be an alternative solution at those regions where MV line investment is challenging due to land use issues or bureaucratic concerns. In addition, the study shows that 1 kV implementation could be cost effective than the traditional MV expansion. Furthermore, such an implementation provides more flexibility to the operators, as addressed in the study.","PeriodicalId":207857,"journal":{"name":"2017 5th International Istanbul Smart Grid and Cities Congress and Fair (ICSG)","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Implementation of 1 kV on LV feeders: A smart alternative to MV line investments to solve voltage drop problems at LV systems\",\"authors\":\"Kadir Özen, M. E. Cebeci, O. B. Tör, Gökhan Batar, Andaç Kiliç, Ülfet Türkmen, A. Güven\",\"doi\":\"10.1109/SGCF.2017.7947630\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents methodology and on-site pilot implementation of utilizing 1 kV at low voltage (LV) feeders as an alternative to medium voltage (MV) line investments to solve voltage drop problems at LV systems. Typically distribution companies solve voltage drop problems of LV system by installing a new MV/LV transformer and transferring outmost loads of the existing transformer to the new transformer. This necessitates installation of MV line between the existing and new transformer. The implementation of 1 kV on the existing LV lines eliminates the need for MV line investment. It can be an alternative solution at those regions where MV line investment is challenging due to land use issues or bureaucratic concerns. In addition, the study shows that 1 kV implementation could be cost effective than the traditional MV expansion. Furthermore, such an implementation provides more flexibility to the operators, as addressed in the study.\",\"PeriodicalId\":207857,\"journal\":{\"name\":\"2017 5th International Istanbul Smart Grid and Cities Congress and Fair (ICSG)\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 5th International Istanbul Smart Grid and Cities Congress and Fair (ICSG)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SGCF.2017.7947630\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 5th International Istanbul Smart Grid and Cities Congress and Fair (ICSG)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SGCF.2017.7947630","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了利用低压(LV)馈线1千伏作为中压(MV)线路投资的替代方案来解决低压系统电压下降问题的方法和现场试点实施。通常,配电公司通过安装新的中压/低压变压器并将现有变压器的大部分负载转移到新变压器来解决低压系统的压降问题。这就需要在现有变压器和新变压器之间安装中压线路。在现有的低压线路上实施1kv消除了中压线路投资的需要。在那些由于土地使用问题或官僚主义问题而对中压线路投资具有挑战性的地区,这可能是另一种解决方案。此外,研究表明,1千伏的实施比传统的中伏扩展更具成本效益。此外,如研究中所述,这种实施为作业者提供了更大的灵活性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Implementation of 1 kV on LV feeders: A smart alternative to MV line investments to solve voltage drop problems at LV systems
This paper presents methodology and on-site pilot implementation of utilizing 1 kV at low voltage (LV) feeders as an alternative to medium voltage (MV) line investments to solve voltage drop problems at LV systems. Typically distribution companies solve voltage drop problems of LV system by installing a new MV/LV transformer and transferring outmost loads of the existing transformer to the new transformer. This necessitates installation of MV line between the existing and new transformer. The implementation of 1 kV on the existing LV lines eliminates the need for MV line investment. It can be an alternative solution at those regions where MV line investment is challenging due to land use issues or bureaucratic concerns. In addition, the study shows that 1 kV implementation could be cost effective than the traditional MV expansion. Furthermore, such an implementation provides more flexibility to the operators, as addressed in the study.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信