通过门控信号的自动调谐降低全桥变换器的共模电磁干扰

Kai Zhang, Yunbin Zhou, Yonggao Zhang, Y. Kang
{"title":"通过门控信号的自动调谐降低全桥变换器的共模电磁干扰","authors":"Kai Zhang, Yunbin Zhou, Yonggao Zhang, Y. Kang","doi":"10.1109/IPEMC.2006.4778046","DOIUrl":null,"url":null,"abstract":"Theoretically, a full-bridge converter under bipolar PWM should produce very little common mode noise because the two phase-legs can compensate for each other, but this feature is often disrupted by different transmission delays of the gating signals. In this paper, a method to address this problem through automatic tuning of the pulse edges of gating signals is proposed. Specifically, the CM noise current is sensed by a DSP and the noise energy is calculated, then a search algorithm is employed to tuning the pulse edges of the gating signals in order to minimize the CM noise. Experimental results show that up to 10 dB reduction of the CM current can be obtained from 500 kHz to 5 MHz. Implementation of the this method requires little hardware expense, and the software can be synthesized into the main control DSP of the converter","PeriodicalId":448315,"journal":{"name":"2006 CES/IEEE 5th International Power Electronics and Motion Control Conference","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Reduction of Common Mode EMI in a Full-Bridge Converter through Automatic Tuning of Gating Signals\",\"authors\":\"Kai Zhang, Yunbin Zhou, Yonggao Zhang, Y. Kang\",\"doi\":\"10.1109/IPEMC.2006.4778046\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Theoretically, a full-bridge converter under bipolar PWM should produce very little common mode noise because the two phase-legs can compensate for each other, but this feature is often disrupted by different transmission delays of the gating signals. In this paper, a method to address this problem through automatic tuning of the pulse edges of gating signals is proposed. Specifically, the CM noise current is sensed by a DSP and the noise energy is calculated, then a search algorithm is employed to tuning the pulse edges of the gating signals in order to minimize the CM noise. Experimental results show that up to 10 dB reduction of the CM current can be obtained from 500 kHz to 5 MHz. Implementation of the this method requires little hardware expense, and the software can be synthesized into the main control DSP of the converter\",\"PeriodicalId\":448315,\"journal\":{\"name\":\"2006 CES/IEEE 5th International Power Electronics and Motion Control Conference\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 CES/IEEE 5th International Power Electronics and Motion Control Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IPEMC.2006.4778046\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 CES/IEEE 5th International Power Electronics and Motion Control Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IPEMC.2006.4778046","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

理论上,双极PWM下的全桥变换器应该产生很少的共模噪声,因为两个相脚可以相互补偿,但这一特性经常被门控信号的不同传输延迟所破坏。本文提出了一种通过自动调谐门控信号脉冲边缘来解决这一问题的方法。具体来说,通过DSP检测CM噪声电流并计算噪声能量,然后利用搜索算法对门控信号的脉冲边缘进行调谐,使CM噪声最小化。实验结果表明,在500 kHz至5 MHz范围内,CM电流可降低10 dB。该方法的实现所需的硬件费用很少,并且软件可以合成到变换器的主控DSP中
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Reduction of Common Mode EMI in a Full-Bridge Converter through Automatic Tuning of Gating Signals
Theoretically, a full-bridge converter under bipolar PWM should produce very little common mode noise because the two phase-legs can compensate for each other, but this feature is often disrupted by different transmission delays of the gating signals. In this paper, a method to address this problem through automatic tuning of the pulse edges of gating signals is proposed. Specifically, the CM noise current is sensed by a DSP and the noise energy is calculated, then a search algorithm is employed to tuning the pulse edges of the gating signals in order to minimize the CM noise. Experimental results show that up to 10 dB reduction of the CM current can be obtained from 500 kHz to 5 MHz. Implementation of the this method requires little hardware expense, and the software can be synthesized into the main control DSP of the converter
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信