剪发区剪发区修护,具有正常化和结节作为水灾控制

Muhammad Fahrizal Alfianto, M. Efendi, Sutikno Sutikno
{"title":"剪发区剪发区修护,具有正常化和结节作为水灾控制","authors":"Muhammad Fahrizal Alfianto, M. Efendi, Sutikno Sutikno","doi":"10.55404/jos-mrk.2021.02.03.131-137","DOIUrl":null,"url":null,"abstract":"Flooding is a problem that often occurs on the banks of the Gunting River, Sumiboto District, Jombang Regency. Reduced river capacity due to the accumulation of sedimentation and narrowing of river bodies that occurs due to natural factors or human activity. Several technical and non-technical ways to anticipate and control flooding. Technically, it can be carried out normalizing rivers and embankments, constructing floodways, constructing retarding basins, constructing sudetan, and controlling floods with reservoirs. Whereas non-technically, it can be through flood plain management, land use management in flood watersheds, socialization, or counseling to the community about flooding problems, and utilization of existing river banks. Based on the calculation, there is a design rainfall of 124,007 mm. Buntung River flood debit with a 50-years return period of 342,935 m3/second. Based on the analysis with a 50-years return period, the existing section can’t accommodate the planned flood discharge, so it is planned to improve the river. The cross-sectional dimensions of the river use a trapezoidal shape. The result of the embankment planning is obtained at least 0.75 m of embankment guard from the water level. Based on the calculation of the Budget Plan it gets around Rp. 226.170.610.600.-","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"PERBAIKAN PADA ALUR SUNGAI GUNTING KABUPATEN JOMBANG DENGAN NORMALISASI DAN TURAP SEBAGAI PENGENDALI BANJIR\",\"authors\":\"Muhammad Fahrizal Alfianto, M. Efendi, Sutikno Sutikno\",\"doi\":\"10.55404/jos-mrk.2021.02.03.131-137\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Flooding is a problem that often occurs on the banks of the Gunting River, Sumiboto District, Jombang Regency. Reduced river capacity due to the accumulation of sedimentation and narrowing of river bodies that occurs due to natural factors or human activity. Several technical and non-technical ways to anticipate and control flooding. Technically, it can be carried out normalizing rivers and embankments, constructing floodways, constructing retarding basins, constructing sudetan, and controlling floods with reservoirs. Whereas non-technically, it can be through flood plain management, land use management in flood watersheds, socialization, or counseling to the community about flooding problems, and utilization of existing river banks. Based on the calculation, there is a design rainfall of 124,007 mm. Buntung River flood debit with a 50-years return period of 342,935 m3/second. Based on the analysis with a 50-years return period, the existing section can’t accommodate the planned flood discharge, so it is planned to improve the river. The cross-sectional dimensions of the river use a trapezoidal shape. The result of the embankment planning is obtained at least 0.75 m of embankment guard from the water level. Based on the calculation of the Budget Plan it gets around Rp. 226.170.610.600.-\",\"PeriodicalId\":337938,\"journal\":{\"name\":\"Jurnal JOS-MRK\",\"volume\":\"50 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal JOS-MRK\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55404/jos-mrk.2021.02.03.131-137\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.131-137","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

洪水是中邦县Sumiboto区Gunting河沿岸经常发生的问题。由于自然因素或人类活动造成的泥沙淤积和河体变窄而导致的河流容量减少。预测和控制洪水的几种技术和非技术方法。从技术上讲,可以进行河道和堤防的治理、泄洪道的建设、滞洪流域的建设、堰塞湖的建设和水库的防洪。而非技术方面,它可以通过洪泛平原管理、洪水流域的土地利用管理、社会化或向社区提供有关洪水问题的咨询,以及利用现有的河岸。经计算,设计降雨量为124,007毫米。盆东河汛期为50年,回复期为342,935立方米/秒。基于50年回收期的分析,现有河段已不能满足规划泄洪的要求,拟对河段进行整治。河流的横截面尺寸采用梯形形状。堤防规划的结果是堤防距水位至少0.75 m。根据预算计划的计算,它得到Rp. 226.170.610.600.-
本文章由计算机程序翻译,如有差异,请以英文原文为准。
PERBAIKAN PADA ALUR SUNGAI GUNTING KABUPATEN JOMBANG DENGAN NORMALISASI DAN TURAP SEBAGAI PENGENDALI BANJIR
Flooding is a problem that often occurs on the banks of the Gunting River, Sumiboto District, Jombang Regency. Reduced river capacity due to the accumulation of sedimentation and narrowing of river bodies that occurs due to natural factors or human activity. Several technical and non-technical ways to anticipate and control flooding. Technically, it can be carried out normalizing rivers and embankments, constructing floodways, constructing retarding basins, constructing sudetan, and controlling floods with reservoirs. Whereas non-technically, it can be through flood plain management, land use management in flood watersheds, socialization, or counseling to the community about flooding problems, and utilization of existing river banks. Based on the calculation, there is a design rainfall of 124,007 mm. Buntung River flood debit with a 50-years return period of 342,935 m3/second. Based on the analysis with a 50-years return period, the existing section can’t accommodate the planned flood discharge, so it is planned to improve the river. The cross-sectional dimensions of the river use a trapezoidal shape. The result of the embankment planning is obtained at least 0.75 m of embankment guard from the water level. Based on the calculation of the Budget Plan it gets around Rp. 226.170.610.600.-
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信