DMAIC循环对镀锌线材生产工艺的分析与改进

K. Knop
{"title":"DMAIC循环对镀锌线材生产工艺的分析与改进","authors":"K. Knop","doi":"10.2478/cqpi-2019-0074","DOIUrl":null,"url":null,"abstract":"\n The article presents the results in the scope of analysis and improvement of the galvanized wire production process with the use of Six Sigma's DMAIC cycle. The basic problem was identified - incorrect wire diameters after galvanizing and specific tools and methods were used to analyze this problem and look for its solution. The potential of Pareto analysis, SPC method, control plan, 5WHY analysis was used. As a result of the analyzes carried out, the source cause was identified - contaminated containers dispensing the preparation maintaining the temperature in the galvanizing unit. To eliminate the problem, maintenance of the machine used to cover the bare wire with zinc was carried out, which allowed to achieve the following results: standstills at the Drawing and Galvanizing Department were eliminated, the duration of the manufacturing process and the percentage of products beyond the specification were significantly reduced.","PeriodicalId":251135,"journal":{"name":"Quality Production Improvement - QPI","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Analysis and Improvement of the Galvanized Wire Production Process with the use of DMAIC Cycle\",\"authors\":\"K. Knop\",\"doi\":\"10.2478/cqpi-2019-0074\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The article presents the results in the scope of analysis and improvement of the galvanized wire production process with the use of Six Sigma's DMAIC cycle. The basic problem was identified - incorrect wire diameters after galvanizing and specific tools and methods were used to analyze this problem and look for its solution. The potential of Pareto analysis, SPC method, control plan, 5WHY analysis was used. As a result of the analyzes carried out, the source cause was identified - contaminated containers dispensing the preparation maintaining the temperature in the galvanizing unit. To eliminate the problem, maintenance of the machine used to cover the bare wire with zinc was carried out, which allowed to achieve the following results: standstills at the Drawing and Galvanizing Department were eliminated, the duration of the manufacturing process and the percentage of products beyond the specification were significantly reduced.\",\"PeriodicalId\":251135,\"journal\":{\"name\":\"Quality Production Improvement - QPI\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Quality Production Improvement - QPI\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/cqpi-2019-0074\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Quality Production Improvement - QPI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/cqpi-2019-0074","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文介绍了运用六西格玛DMAIC循环对镀锌线材生产过程进行分析和改进的结果。确定了镀锌后线径不正确的基本问题,并采用特定的工具和方法对该问题进行了分析,寻找解决方案。采用帕累托电位分析、SPC法、控制计划、5WHY分析。经过分析,确定了污染的原因——在镀锌单元中保持温度的容器被污染。为了消除这一问题,对用于用锌覆盖裸线的机器进行了维护,从而实现了以下结果:消除了拉丝和镀锌部门的停顿,大大减少了制造过程的持续时间和超出规格的产品百分比。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis and Improvement of the Galvanized Wire Production Process with the use of DMAIC Cycle
The article presents the results in the scope of analysis and improvement of the galvanized wire production process with the use of Six Sigma's DMAIC cycle. The basic problem was identified - incorrect wire diameters after galvanizing and specific tools and methods were used to analyze this problem and look for its solution. The potential of Pareto analysis, SPC method, control plan, 5WHY analysis was used. As a result of the analyzes carried out, the source cause was identified - contaminated containers dispensing the preparation maintaining the temperature in the galvanizing unit. To eliminate the problem, maintenance of the machine used to cover the bare wire with zinc was carried out, which allowed to achieve the following results: standstills at the Drawing and Galvanizing Department were eliminated, the duration of the manufacturing process and the percentage of products beyond the specification were significantly reduced.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信