{"title":"未来的中央办公室发电厂","authors":"H. Kopniwsky","doi":"10.1109/INTLEC.1994.396608","DOIUrl":null,"url":null,"abstract":"The author describes an integrated system approach which would create a comprehensive power system that would have the flexibility to serve the power needs of the future central office, with systems to support multimedia and various operational support systems. All requirements for surge immunity, even higher than normal, could be met in a manner where a complete pre-engineered, pre-packaged, pre-constructed system would exist. This would remove the traditional E, F and I tasks from the process thus contributing to predictability, easy of installation, ease of expansion, higher reliability and lower service costs, less debate about how to construct each local site, better customer relations, and a higher quality system that would be verified before leaving the factory.<<ETX>>","PeriodicalId":123164,"journal":{"name":"Proceedings of Intelec 94","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The central office power plant of the future\",\"authors\":\"H. Kopniwsky\",\"doi\":\"10.1109/INTLEC.1994.396608\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The author describes an integrated system approach which would create a comprehensive power system that would have the flexibility to serve the power needs of the future central office, with systems to support multimedia and various operational support systems. All requirements for surge immunity, even higher than normal, could be met in a manner where a complete pre-engineered, pre-packaged, pre-constructed system would exist. This would remove the traditional E, F and I tasks from the process thus contributing to predictability, easy of installation, ease of expansion, higher reliability and lower service costs, less debate about how to construct each local site, better customer relations, and a higher quality system that would be verified before leaving the factory.<<ETX>>\",\"PeriodicalId\":123164,\"journal\":{\"name\":\"Proceedings of Intelec 94\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1994-10-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of Intelec 94\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INTLEC.1994.396608\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of Intelec 94","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.1994.396608","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

作者描述了一种综合系统方法,该方法将创建一个综合电力系统,该系统将具有灵活性,以满足未来中央办事处的电力需求,并具有支持多媒体和各种业务支持系统的系统。如果存在一个完整的预先设计、预先包装、预先构造的系统,则可以满足浪涌抗扰度的所有要求,甚至高于正常要求。这将消除传统的E, F和I任务,从而有助于可预测性,易于安装,易于扩展,更高的可靠性和更低的服务成本,减少关于如何构建每个本地站点的争论,更好的客户关系,以及在出厂前验证的更高质量系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The central office power plant of the future
The author describes an integrated system approach which would create a comprehensive power system that would have the flexibility to serve the power needs of the future central office, with systems to support multimedia and various operational support systems. All requirements for surge immunity, even higher than normal, could be met in a manner where a complete pre-engineered, pre-packaged, pre-constructed system would exist. This would remove the traditional E, F and I tasks from the process thus contributing to predictability, easy of installation, ease of expansion, higher reliability and lower service costs, less debate about how to construct each local site, better customer relations, and a higher quality system that would be verified before leaving the factory.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信