水电站在梯级系统中的运行模式取决于电力系统的需要

Sofija Nikolova Poceva, A. Chaushevski, V. Stojkovski, Z. Markov
{"title":"水电站在梯级系统中的运行模式取决于电力系统的需要","authors":"Sofija Nikolova Poceva, A. Chaushevski, V. Stojkovski, Z. Markov","doi":"10.46793/eee20-1-2.153np","DOIUrl":null,"url":null,"abstract":"The paper presents the methodology for hydro power plants operation (Long-term and Short-term) in a hydro power cascade system. It includes water managing of generating and/or pumping units taking into accounts technical characteristics of the power plants facilities (turbine/generator and pump/motor systems), reservoirs characteristics considering all hydraulically connected infrastructures which are, as well as the hydrological conditions (for run offs and turbine inflows). The goal of the operation for all hydropower system is to have maximum profit from electricity production taking into account electricity market environment, power system requirements, as well as satisfying technical conditions and at the same time avoiding water spilling as it is maximum possible. Operating modes of the hydro power plants depend on electricity market price, tariff prices and time duration of each tariff (base, peak, and rush hour), technical characteristics of the unit(s), hydro technical conditions, water reservoir’s volumes, run off and others. The application of the model is presented with the results on real hydro power systems consist of different hydraulic connections in various cases depend on hydrological conditions and requirements. The model can be used to make preliminary analysis for additional improvement of hydro systems as having the results for additional installed power of the existing system. The selected output results are presented with appropriated comparing and at the end with conclusion remarks.","PeriodicalId":236996,"journal":{"name":"Energija, ekonomija, ekologija","volume":"28 28","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Hydro power plants operating modes in a cascade system depending on the needs of the power system\",\"authors\":\"Sofija Nikolova Poceva, A. Chaushevski, V. Stojkovski, Z. Markov\",\"doi\":\"10.46793/eee20-1-2.153np\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper presents the methodology for hydro power plants operation (Long-term and Short-term) in a hydro power cascade system. It includes water managing of generating and/or pumping units taking into accounts technical characteristics of the power plants facilities (turbine/generator and pump/motor systems), reservoirs characteristics considering all hydraulically connected infrastructures which are, as well as the hydrological conditions (for run offs and turbine inflows). The goal of the operation for all hydropower system is to have maximum profit from electricity production taking into account electricity market environment, power system requirements, as well as satisfying technical conditions and at the same time avoiding water spilling as it is maximum possible. Operating modes of the hydro power plants depend on electricity market price, tariff prices and time duration of each tariff (base, peak, and rush hour), technical characteristics of the unit(s), hydro technical conditions, water reservoir’s volumes, run off and others. The application of the model is presented with the results on real hydro power systems consist of different hydraulic connections in various cases depend on hydrological conditions and requirements. The model can be used to make preliminary analysis for additional improvement of hydro systems as having the results for additional installed power of the existing system. The selected output results are presented with appropriated comparing and at the end with conclusion remarks.\",\"PeriodicalId\":236996,\"journal\":{\"name\":\"Energija, ekonomija, ekologija\",\"volume\":\"28 28\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Energija, ekonomija, ekologija\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.46793/eee20-1-2.153np\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energija, ekonomija, ekologija","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46793/eee20-1-2.153np","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了水电梯级系统中水电站的长期和短期运行方法。它包括发电和/或抽水机组的水管理,考虑到发电厂设施的技术特性(水轮机/发电机和水泵/电机系统),水库特性考虑到所有水力连接的基础设施,以及水文条件(径流和水轮机流入)。所有水电系统的运行目标都是在考虑电力市场环境、电力系统要求、满足技术条件的情况下,最大限度地实现发电利润最大化,同时最大限度地避免水外溢。水电站的运行方式取决于电力市场价格、电价价格、各电价时段(基峰、尖峰)、机组技术特性、水电技术条件、水库容量、流量等因素。给出了该模型在不同水文条件和要求下由不同水力连接组成的实际水电系统中的应用结果。该模型可用于对现有系统的附加装机功率进行初步分析。对选定的输出结果进行了适当的比较,并在最后给出了结束语。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Hydro power plants operating modes in a cascade system depending on the needs of the power system
The paper presents the methodology for hydro power plants operation (Long-term and Short-term) in a hydro power cascade system. It includes water managing of generating and/or pumping units taking into accounts technical characteristics of the power plants facilities (turbine/generator and pump/motor systems), reservoirs characteristics considering all hydraulically connected infrastructures which are, as well as the hydrological conditions (for run offs and turbine inflows). The goal of the operation for all hydropower system is to have maximum profit from electricity production taking into account electricity market environment, power system requirements, as well as satisfying technical conditions and at the same time avoiding water spilling as it is maximum possible. Operating modes of the hydro power plants depend on electricity market price, tariff prices and time duration of each tariff (base, peak, and rush hour), technical characteristics of the unit(s), hydro technical conditions, water reservoir’s volumes, run off and others. The application of the model is presented with the results on real hydro power systems consist of different hydraulic connections in various cases depend on hydrological conditions and requirements. The model can be used to make preliminary analysis for additional improvement of hydro systems as having the results for additional installed power of the existing system. The selected output results are presented with appropriated comparing and at the end with conclusion remarks.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信