{"title":"一系列地面位移事件的有限元模拟和应力消除程序","authors":"H. Karimian, P. Barlow, C. Blackwell, Chris Campbell","doi":"10.1115/ipg2019-5339","DOIUrl":null,"url":null,"abstract":"\n The Wapiti River South Slope (the Slope) near Grand Prairie, Alberta, Canada, is 500 m long and consists of a steep lower slope and a shallower upper slope. Both the upper and the lower slopes are located within a landslide complex with ground movements of varying magnitudes and depths. The Alliance Pipeline (Alliance) NPS 42 Mainline (the pipeline) was installed in the winter of 2000 using conventional trenching techniques at an angle of approximately 8° to the slope fall line. Evidence of slope instability was observed in the slope since 2007. The surficial geology of the slope comprises a colluvium layer draped over bedrock formation in the lower slope, and glacial deposits in the upper slope. Available data indicated two different slide mechanisms. In the lower slope, there is a shallow translational slide within a colluvium layer, and in the upper slope there is a deep-seated translational slide within the glacial deposits. Both the upper and lower slope landslides have been confirmed to be active in the past decade.\n Gradual ground displacements in the order of several centimeters per year were observed in both the upper and lower slopes between 2007 and 2012. Large ground displacements in the order of several meters were observed between 2012 and 2014 in the lower slope that led to the first stress relief and subsequent slope mitigation measures in the spring and summer of 2014. Monitoring of the slope after mitigations indicated significant reduction in the rate of ground movement in the lower slope. Surveying of the pipeline before and after stress relief indicated an increase in lateral pipeline deformation in the direction of ground movement, following the stress relief. This observation raised questions regarding the effectiveness of partial stress relief to reduce stresses and strains associated with ground movements. Finite element analysis (FEA) was conducted in 2016 to aid in assessing the condition of the pipeline after being subject to ground displacements prior to 2014, stress relief in 2014, and subsequent ground displacement from July 2014 to December 2016. The results and findings of the FEA reasonably matched the observed pipeline behaviour before and after stress relief in the lower slope. The FEA results demonstrated that while the lateral displacement of the pipeline, originally caused by ground movement, increased following the removal of the soil loading during the stress relief, the maximum pipeline strain was reduced within the excavated portion.\n The FEA was also employed to assess the pipeline response to potential ground displacement scenarios following December 2016. For this assessment, three ground displacement scenarios that comprise different lengths of the pipeline were analyzed. An increased rate of ground displacement, with a pattern that matched one of the analyzed scenarios, was observed in the upper slope in the spring of 2017. The results of FEA were used to assess the pipeline response to the increased rate of displacement in the upper slope. Subsequently a decision was made to stress-relieve the pipeline. The second stress-relief was conducted in the summer of 2017. This stress relief was conducted locally at the toe and head of the active slide in the upper slope, where the FEA showed the greatest stress concentrations in the pipeline.","PeriodicalId":325632,"journal":{"name":"ASME-ARPEL 2019 International Pipeline Geotechnical Conference","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Finite Element Modelling of a Series of Ground Displacement Episodes and Stress Relief Procedures\",\"authors\":\"H. Karimian, P. Barlow, C. Blackwell, Chris Campbell\",\"doi\":\"10.1115/ipg2019-5339\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The Wapiti River South Slope (the Slope) near Grand Prairie, Alberta, Canada, is 500 m long and consists of a steep lower slope and a shallower upper slope. Both the upper and the lower slopes are located within a landslide complex with ground movements of varying magnitudes and depths. The Alliance Pipeline (Alliance) NPS 42 Mainline (the pipeline) was installed in the winter of 2000 using conventional trenching techniques at an angle of approximately 8° to the slope fall line. Evidence of slope instability was observed in the slope since 2007. The surficial geology of the slope comprises a colluvium layer draped over bedrock formation in the lower slope, and glacial deposits in the upper slope. Available data indicated two different slide mechanisms. In the lower slope, there is a shallow translational slide within a colluvium layer, and in the upper slope there is a deep-seated translational slide within the glacial deposits. Both the upper and lower slope landslides have been confirmed to be active in the past decade.\\n Gradual ground displacements in the order of several centimeters per year were observed in both the upper and lower slopes between 2007 and 2012. Large ground displacements in the order of several meters were observed between 2012 and 2014 in the lower slope that led to the first stress relief and subsequent slope mitigation measures in the spring and summer of 2014. Monitoring of the slope after mitigations indicated significant reduction in the rate of ground movement in the lower slope. Surveying of the pipeline before and after stress relief indicated an increase in lateral pipeline deformation in the direction of ground movement, following the stress relief. This observation raised questions regarding the effectiveness of partial stress relief to reduce stresses and strains associated with ground movements. Finite element analysis (FEA) was conducted in 2016 to aid in assessing the condition of the pipeline after being subject to ground displacements prior to 2014, stress relief in 2014, and subsequent ground displacement from July 2014 to December 2016. The results and findings of the FEA reasonably matched the observed pipeline behaviour before and after stress relief in the lower slope. The FEA results demonstrated that while the lateral displacement of the pipeline, originally caused by ground movement, increased following the removal of the soil loading during the stress relief, the maximum pipeline strain was reduced within the excavated portion.\\n The FEA was also employed to assess the pipeline response to potential ground displacement scenarios following December 2016. For this assessment, three ground displacement scenarios that comprise different lengths of the pipeline were analyzed. An increased rate of ground displacement, with a pattern that matched one of the analyzed scenarios, was observed in the upper slope in the spring of 2017. The results of FEA were used to assess the pipeline response to the increased rate of displacement in the upper slope. Subsequently a decision was made to stress-relieve the pipeline. The second stress-relief was conducted in the summer of 2017. This stress relief was conducted locally at the toe and head of the active slide in the upper slope, where the FEA showed the greatest stress concentrations in the pipeline.\",\"PeriodicalId\":325632,\"journal\":{\"name\":\"ASME-ARPEL 2019 International Pipeline Geotechnical Conference\",\"volume\":\"25 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ASME-ARPEL 2019 International Pipeline Geotechnical Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1115/ipg2019-5339\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASME-ARPEL 2019 International Pipeline Geotechnical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/ipg2019-5339","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

瓦皮提河南坡位于加拿大阿尔伯塔省大草原附近,长500米,由陡峭的下坡和较浅的上坡组成。上下两坡都位于滑坡复合体内,具有不同震级和深度的地面运动。联盟管道(联盟)NPS 42干线(管道)于2000年冬季安装,使用传统的沟槽技术,与斜坡下降线成约8°角。自2007年以来,在边坡中观察到边坡失稳的证据。斜坡的表面地质包括下斜坡覆盖在基岩地层上的崩积层和上斜坡的冰川沉积物。现有数据表明有两种不同的滑动机制。下坡在崩积层内存在浅层平移滑动,上坡在冰川沉积物内存在深层平移滑动。在过去的十年里,上、下坡滑坡都被证实是活跃的。在2007 - 2012年期间,在上、下斜坡均观测到每年数厘米的逐渐地面位移。2012年至2014年期间,在下边坡观测到数米量级的大地面位移,导致了2014年春夏的第一次应力消除和随后的边坡缓解措施。缓坡后对坡度的监测表明,较低坡度的地面移动速度显著降低。对应力解除前后管道的测量表明,应力解除后,管道沿地面运动方向的侧向变形增大。这一观察结果提出了关于局部应力释放以减少与地面运动有关的应力和应变的有效性的问题。2016年进行了有限元分析(FEA),以帮助评估管道在经历了2014年之前的地面位移、2014年的应力消除以及2014年7月至2016年12月的后续地面位移之后的状况。有限元分析的结果与观察到的下坡应力消除前后管道的行为基本吻合。有限元分析结果表明:卸除土体荷载后,原由地面移动引起的管道侧向位移增大,但开挖段内管道最大应变减小;FEA还用于评估2016年12月之后管道对潜在地面位移情景的响应。为了进行评估,分析了三种不同管道长度的地面位移情况。2017年春季,在上部边坡观察到地面位移率增加,其模式与所分析的情景之一相匹配。利用有限元分析的结果来评估管道对上坡位移增加速率的响应。随后,公司决定对管道进行减压。第二次减压在2017年夏天进行。这种应力释放是在上部边坡活动滑动的脚趾和头部局部进行的,有限元分析显示管道中的应力集中程度最大。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Finite Element Modelling of a Series of Ground Displacement Episodes and Stress Relief Procedures
The Wapiti River South Slope (the Slope) near Grand Prairie, Alberta, Canada, is 500 m long and consists of a steep lower slope and a shallower upper slope. Both the upper and the lower slopes are located within a landslide complex with ground movements of varying magnitudes and depths. The Alliance Pipeline (Alliance) NPS 42 Mainline (the pipeline) was installed in the winter of 2000 using conventional trenching techniques at an angle of approximately 8° to the slope fall line. Evidence of slope instability was observed in the slope since 2007. The surficial geology of the slope comprises a colluvium layer draped over bedrock formation in the lower slope, and glacial deposits in the upper slope. Available data indicated two different slide mechanisms. In the lower slope, there is a shallow translational slide within a colluvium layer, and in the upper slope there is a deep-seated translational slide within the glacial deposits. Both the upper and lower slope landslides have been confirmed to be active in the past decade. Gradual ground displacements in the order of several centimeters per year were observed in both the upper and lower slopes between 2007 and 2012. Large ground displacements in the order of several meters were observed between 2012 and 2014 in the lower slope that led to the first stress relief and subsequent slope mitigation measures in the spring and summer of 2014. Monitoring of the slope after mitigations indicated significant reduction in the rate of ground movement in the lower slope. Surveying of the pipeline before and after stress relief indicated an increase in lateral pipeline deformation in the direction of ground movement, following the stress relief. This observation raised questions regarding the effectiveness of partial stress relief to reduce stresses and strains associated with ground movements. Finite element analysis (FEA) was conducted in 2016 to aid in assessing the condition of the pipeline after being subject to ground displacements prior to 2014, stress relief in 2014, and subsequent ground displacement from July 2014 to December 2016. The results and findings of the FEA reasonably matched the observed pipeline behaviour before and after stress relief in the lower slope. The FEA results demonstrated that while the lateral displacement of the pipeline, originally caused by ground movement, increased following the removal of the soil loading during the stress relief, the maximum pipeline strain was reduced within the excavated portion. The FEA was also employed to assess the pipeline response to potential ground displacement scenarios following December 2016. For this assessment, three ground displacement scenarios that comprise different lengths of the pipeline were analyzed. An increased rate of ground displacement, with a pattern that matched one of the analyzed scenarios, was observed in the upper slope in the spring of 2017. The results of FEA were used to assess the pipeline response to the increased rate of displacement in the upper slope. Subsequently a decision was made to stress-relieve the pipeline. The second stress-relief was conducted in the summer of 2017. This stress relief was conducted locally at the toe and head of the active slide in the upper slope, where the FEA showed the greatest stress concentrations in the pipeline.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信