匈牙利法在家庭工业生产员工分配与利润调度优化中的应用

S. Rusdiana, Rini Oktavia, E. Charlie
{"title":"匈牙利法在家庭工业生产员工分配与利润调度优化中的应用","authors":"S. Rusdiana, Rini Oktavia, E. Charlie","doi":"10.32734/JORMTT.V1I1.754","DOIUrl":null,"url":null,"abstract":"This research has a purpose to optimize the scheduling of employees in an embroidery company for doing certain tasks using Hungarian method, as well as analyzing the sensitivity of the optimal solution if there is a reduction on the employees’ time to finish the tasks. The Hungarian method was applied on the assignment of workers in embroidery process involving 11 employees and 10 tasks. The optimal scheduling result minimizes the time of the embroidery production of the company. The optimal scheduling result found the optimal assignment of each worker to the tasks with the total work time is 13,7 hours. After the Hungarian method was applied, the company got the increasing revenue as much as 9,09 %. The sensitivity analysis was conducted by reducing the time of the employees take in embroidery the bags. The results of the sensitivity analysis are some boundaries for basis and non basis variables to maintain the optimal solution.","PeriodicalId":372795,"journal":{"name":"Journal of Research in Mathematics Trends and Technology","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-02-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Application Of Hungarian Method In Optimizing The Scheduling Of Employee Assignment And Profit Of Home Industry Production\",\"authors\":\"S. Rusdiana, Rini Oktavia, E. Charlie\",\"doi\":\"10.32734/JORMTT.V1I1.754\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This research has a purpose to optimize the scheduling of employees in an embroidery company for doing certain tasks using Hungarian method, as well as analyzing the sensitivity of the optimal solution if there is a reduction on the employees’ time to finish the tasks. The Hungarian method was applied on the assignment of workers in embroidery process involving 11 employees and 10 tasks. The optimal scheduling result minimizes the time of the embroidery production of the company. The optimal scheduling result found the optimal assignment of each worker to the tasks with the total work time is 13,7 hours. After the Hungarian method was applied, the company got the increasing revenue as much as 9,09 %. The sensitivity analysis was conducted by reducing the time of the employees take in embroidery the bags. The results of the sensitivity analysis are some boundaries for basis and non basis variables to maintain the optimal solution.\",\"PeriodicalId\":372795,\"journal\":{\"name\":\"Journal of Research in Mathematics Trends and Technology\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-02-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Research in Mathematics Trends and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32734/JORMTT.V1I1.754\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Research in Mathematics Trends and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32734/JORMTT.V1I1.754","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本研究的目的是利用匈牙利法对某绣花公司员工的任务调度进行优化,并分析在员工完成任务的时间减少的情况下,最优解的灵敏度。将匈牙利方法应用于刺绣过程中11名员工和10项任务的工人分配。最优调度结果使公司的刺绣生产时间最小化。最优调度结果表明,每个工人对任务的最优分配,总工作时间为13.7小时。采用匈牙利法后,公司的收益增加了9.09 %。通过减少员工绣花时间进行敏感性分析。灵敏度分析的结果是基变量和非基变量的一些边界,以保持最优解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Application Of Hungarian Method In Optimizing The Scheduling Of Employee Assignment And Profit Of Home Industry Production
This research has a purpose to optimize the scheduling of employees in an embroidery company for doing certain tasks using Hungarian method, as well as analyzing the sensitivity of the optimal solution if there is a reduction on the employees’ time to finish the tasks. The Hungarian method was applied on the assignment of workers in embroidery process involving 11 employees and 10 tasks. The optimal scheduling result minimizes the time of the embroidery production of the company. The optimal scheduling result found the optimal assignment of each worker to the tasks with the total work time is 13,7 hours. After the Hungarian method was applied, the company got the increasing revenue as much as 9,09 %. The sensitivity analysis was conducted by reducing the time of the employees take in embroidery the bags. The results of the sensitivity analysis are some boundaries for basis and non basis variables to maintain the optimal solution.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信