大型诊断系统的集成与测试

P. Plewinski, D. Makowski, P. Perek, A. Napieralski
{"title":"大型诊断系统的集成与测试","authors":"P. Plewinski, D. Makowski, P. Perek, A. Napieralski","doi":"10.23919/MIXDES.2018.8436929","DOIUrl":null,"url":null,"abstract":"The design of the modern Instrumentation and Control (I&C) systems in large-scale projects such as ITER is technically challenging. They often consist of dozens of various complex and distributed systems, which are developed by numerous independent organizations and companies. The integration of the sub-systems into a coherent system is critical for such projects. System testing at all stages of development and integration is a common method of ensuring the proper quality and adherence to the accepted standards. It is necessary that the tests cover all the requirements and functionality of the system and that they can be executed in a repeatable and error-proof way in order to maximize the gains obtained from the use of testing. This paper presents the strategies of testing and system integration illustrated with an example of ITER project. An approach to automated system testing is also proposed.","PeriodicalId":349007,"journal":{"name":"2018 25th International Conference \"Mixed Design of Integrated Circuits and System\" (MIXDES)","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integration and Testing of Large Scale Diagnostic Systems\",\"authors\":\"P. Plewinski, D. Makowski, P. Perek, A. Napieralski\",\"doi\":\"10.23919/MIXDES.2018.8436929\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The design of the modern Instrumentation and Control (I&C) systems in large-scale projects such as ITER is technically challenging. They often consist of dozens of various complex and distributed systems, which are developed by numerous independent organizations and companies. The integration of the sub-systems into a coherent system is critical for such projects. System testing at all stages of development and integration is a common method of ensuring the proper quality and adherence to the accepted standards. It is necessary that the tests cover all the requirements and functionality of the system and that they can be executed in a repeatable and error-proof way in order to maximize the gains obtained from the use of testing. This paper presents the strategies of testing and system integration illustrated with an example of ITER project. An approach to automated system testing is also proposed.\",\"PeriodicalId\":349007,\"journal\":{\"name\":\"2018 25th International Conference \\\"Mixed Design of Integrated Circuits and System\\\" (MIXDES)\",\"volume\":\"37 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 25th International Conference \\\"Mixed Design of Integrated Circuits and System\\\" (MIXDES)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23919/MIXDES.2018.8436929\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 25th International Conference \"Mixed Design of Integrated Circuits and System\" (MIXDES)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23919/MIXDES.2018.8436929","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在像ITER这样的大型项目中,现代仪器与控制(I&C)系统的设计在技术上具有挑战性。它们通常由许多不同的复杂和分布式系统组成,这些系统由许多独立的组织和公司开发。将子系统集成到一个连贯的系统中对于这样的项目是至关重要的。在开发和集成的所有阶段进行系统测试是确保适当质量和遵守公认标准的常用方法。测试必须涵盖系统的所有需求和功能,并且可以以可重复和防错的方式执行,以便从使用测试中获得最大的收益。本文以ITER项目为例,介绍了测试和系统集成的策略。提出了一种自动化系统测试方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integration and Testing of Large Scale Diagnostic Systems
The design of the modern Instrumentation and Control (I&C) systems in large-scale projects such as ITER is technically challenging. They often consist of dozens of various complex and distributed systems, which are developed by numerous independent organizations and companies. The integration of the sub-systems into a coherent system is critical for such projects. System testing at all stages of development and integration is a common method of ensuring the proper quality and adherence to the accepted standards. It is necessary that the tests cover all the requirements and functionality of the system and that they can be executed in a repeatable and error-proof way in order to maximize the gains obtained from the use of testing. This paper presents the strategies of testing and system integration illustrated with an example of ITER project. An approach to automated system testing is also proposed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信