{"title":"大型电力变压器套管在线监测","authors":"C. Kane, A. Golubev","doi":"10.1109/EEIC.2005.1566258","DOIUrl":null,"url":null,"abstract":"Industry statistics suggest that 80% of all plant and equipment failures occur on a random basis and only 20% of the failures are age related. This means that 80% of failures have not been detected with common test and maintenance practices and therefore these failures have not been prevented. Based on different sources up to 30-35% of large power transformer failures are attributed to bushing insulation failures. About half of these bushing failures result in an explosion and fire. In today's competitive environment, increasing demands are being placed on the management of physical assets. Advances in technology are allowing new approaches to maintenance. These include reliability-centered maintenance, predictive maintenance, condition monitoring, and expert systems. Trend setting organizations are increasingly taking advantage of the convergence of these new technologies to implement proactive maintenance programs","PeriodicalId":267510,"journal":{"name":"Proceedings Electrical Insulation Conference and Electrical Manufacturing Expo, 2005.","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"On line monitoring of bushings on large power transformers\",\"authors\":\"C. Kane, A. Golubev\",\"doi\":\"10.1109/EEIC.2005.1566258\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Industry statistics suggest that 80% of all plant and equipment failures occur on a random basis and only 20% of the failures are age related. This means that 80% of failures have not been detected with common test and maintenance practices and therefore these failures have not been prevented. Based on different sources up to 30-35% of large power transformer failures are attributed to bushing insulation failures. About half of these bushing failures result in an explosion and fire. In today's competitive environment, increasing demands are being placed on the management of physical assets. Advances in technology are allowing new approaches to maintenance. These include reliability-centered maintenance, predictive maintenance, condition monitoring, and expert systems. Trend setting organizations are increasingly taking advantage of the convergence of these new technologies to implement proactive maintenance programs\",\"PeriodicalId\":267510,\"journal\":{\"name\":\"Proceedings Electrical Insulation Conference and Electrical Manufacturing Expo, 2005.\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings Electrical Insulation Conference and Electrical Manufacturing Expo, 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEIC.2005.1566258\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings Electrical Insulation Conference and Electrical Manufacturing Expo, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEIC.2005.1566258","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

行业统计数据表明,80%的工厂和设备故障是随机发生的,只有20%的故障与年龄有关。这意味着80%的故障没有被常规的测试和维护实践检测到,因此这些故障没有被阻止。根据不同的来源,高达30-35%的大型电力变压器故障归因于套管绝缘故障。这些套管故障中约有一半会导致爆炸和火灾。在当今竞争激烈的环境中,对实物资产管理的要求越来越高。技术的进步为维护提供了新的方法。其中包括以可靠性为中心的维护、预测性维护、状态监测和专家系统。引领趋势的组织越来越多地利用这些新技术的融合来实施主动维护计划
本文章由计算机程序翻译,如有差异,请以英文原文为准。
On line monitoring of bushings on large power transformers
Industry statistics suggest that 80% of all plant and equipment failures occur on a random basis and only 20% of the failures are age related. This means that 80% of failures have not been detected with common test and maintenance practices and therefore these failures have not been prevented. Based on different sources up to 30-35% of large power transformer failures are attributed to bushing insulation failures. About half of these bushing failures result in an explosion and fire. In today's competitive environment, increasing demands are being placed on the management of physical assets. Advances in technology are allowing new approaches to maintenance. These include reliability-centered maintenance, predictive maintenance, condition monitoring, and expert systems. Trend setting organizations are increasingly taking advantage of the convergence of these new technologies to implement proactive maintenance programs
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信