{"title":"一个用于Tevatron的快速注入磁铁","authors":"C. Jensen, B. Hanna, Fermilab R. Reilly","doi":"10.1109/PAC.2001.988231","DOIUrl":null,"url":null,"abstract":"A new proton injection kicker system is required for the Tevatron in the Run II era. The new system was designed to supply 1.25 kG-m into a magnetic aperture of 48 mm vertical /spl times/ 71 mm horizontal /spl times/ 5 m long with a 396 ns bunch spacing. The system is configured to be upgraded to a bunch spacing of 132 ns with additional pulsed power supplies. The design of the magnet incorporated some novel features in order to meet these requirements. These include adjustable bus spacing to set the inductance, balanced positive and negative high voltage buses and an integrated capacitive pickup. This system has been installed in the Tevatron since July 2000.","PeriodicalId":313758,"journal":{"name":"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)","volume":"78 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"A fast injection kicker magnet for the Tevatron\",\"authors\":\"C. Jensen, B. Hanna, Fermilab R. Reilly\",\"doi\":\"10.1109/PAC.2001.988231\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A new proton injection kicker system is required for the Tevatron in the Run II era. The new system was designed to supply 1.25 kG-m into a magnetic aperture of 48 mm vertical /spl times/ 71 mm horizontal /spl times/ 5 m long with a 396 ns bunch spacing. The system is configured to be upgraded to a bunch spacing of 132 ns with additional pulsed power supplies. The design of the magnet incorporated some novel features in order to meet these requirements. These include adjustable bus spacing to set the inductance, balanced positive and negative high voltage buses and an integrated capacitive pickup. This system has been installed in the Tevatron since July 2000.\",\"PeriodicalId\":313758,\"journal\":{\"name\":\"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)\",\"volume\":\"78 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-07-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PAC.2001.988231\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAC.2001.988231","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7
摘要
在Run II时代,Tevatron需要一种新的质子注入增压系统。新系统的设计目标是将1.25 kG-m送入垂直48 mm /spl次/水平71 mm /spl次/ 5米长的磁孔中,束束间距为396 ns。通过额外的脉冲电源,该系统可以升级到132 ns的串间距。磁铁的设计纳入了一些新颖的特点,以满足这些要求。这些包括可调节的母线间距,以设置电感,平衡的正、负高压母线和集成电容拾音器。该系统已于2000年7月安装在Tevatron上。
A new proton injection kicker system is required for the Tevatron in the Run II era. The new system was designed to supply 1.25 kG-m into a magnetic aperture of 48 mm vertical /spl times/ 71 mm horizontal /spl times/ 5 m long with a 396 ns bunch spacing. The system is configured to be upgraded to a bunch spacing of 132 ns with additional pulsed power supplies. The design of the magnet incorporated some novel features in order to meet these requirements. These include adjustable bus spacing to set the inductance, balanced positive and negative high voltage buses and an integrated capacitive pickup. This system has been installed in the Tevatron since July 2000.