仔细检查连接接地电极(NEC 2011,第250条要求)

Devine Pe
{"title":"仔细检查连接接地电极(NEC 2011,第250条要求)","authors":"Devine Pe","doi":"10.1109/IAS.2011.6074262","DOIUrl":null,"url":null,"abstract":"This paper describes the grounding design of a 480V, 3-phase, 4-wire power distribution system for a rail transit facility consisting of a passenger station and two separate parking garages. The authority having jurisdiction (AHJ) made an interpretation of NEC Section 250.50 that the grounding electrodes of the power panels at three different locations should be bonded to the main switchboard grounding electrodes by installing underground bonding conductors. Designers disagreed with AHJ and were opposed to such installation. Due to physical locations of the panels and the switchboard within the facility, such installation was impractical. To meet NEC requirements and to satisfy AHJ, a discussion of bonding of facility grounding electrodes is included in this paper. At locations where underground bonding conductors were not practical to install, bonding of structural steel members with metallic conduits for feeder cables that carry equipment grounding conductors between the main switchboard and various power panels act as bonding conductors.","PeriodicalId":268988,"journal":{"name":"2011 IEEE Industry Applications Society Annual Meeting","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-11-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A closer look at bonding grounding electrodes (NEC 2011, article 250 requirements)\",\"authors\":\"Devine Pe\",\"doi\":\"10.1109/IAS.2011.6074262\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes the grounding design of a 480V, 3-phase, 4-wire power distribution system for a rail transit facility consisting of a passenger station and two separate parking garages. The authority having jurisdiction (AHJ) made an interpretation of NEC Section 250.50 that the grounding electrodes of the power panels at three different locations should be bonded to the main switchboard grounding electrodes by installing underground bonding conductors. Designers disagreed with AHJ and were opposed to such installation. Due to physical locations of the panels and the switchboard within the facility, such installation was impractical. To meet NEC requirements and to satisfy AHJ, a discussion of bonding of facility grounding electrodes is included in this paper. At locations where underground bonding conductors were not practical to install, bonding of structural steel members with metallic conduits for feeder cables that carry equipment grounding conductors between the main switchboard and various power panels act as bonding conductors.\",\"PeriodicalId\":268988,\"journal\":{\"name\":\"2011 IEEE Industry Applications Society Annual Meeting\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-11-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 IEEE Industry Applications Society Annual Meeting\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IAS.2011.6074262\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE Industry Applications Society Annual Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAS.2011.6074262","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了由一个客运站和两个独立停车库组成的轨道交通设施480V、三相、4线配电系统的接地设计。有管辖权的当局(AHJ)对NEC第250.50条作出解释,三个不同位置的电源板的接地电极应通过安装地下连接导体与主配电盘接地电极连接。设计师不同意AHJ的意见,反对这样的安装。由于设备内面板和配电盘的物理位置,这种安装是不切实际的。为了满足NEC的要求和AHJ的要求,本文讨论了设施接地电极的搭接问题。在不适合安装地下连接导线的地方,将钢结构构件与用于在主配电盘和各种电源板之间承载设备接地导线的馈线电缆的金属导管连接,作为连接导线。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A closer look at bonding grounding electrodes (NEC 2011, article 250 requirements)
This paper describes the grounding design of a 480V, 3-phase, 4-wire power distribution system for a rail transit facility consisting of a passenger station and two separate parking garages. The authority having jurisdiction (AHJ) made an interpretation of NEC Section 250.50 that the grounding electrodes of the power panels at three different locations should be bonded to the main switchboard grounding electrodes by installing underground bonding conductors. Designers disagreed with AHJ and were opposed to such installation. Due to physical locations of the panels and the switchboard within the facility, such installation was impractical. To meet NEC requirements and to satisfy AHJ, a discussion of bonding of facility grounding electrodes is included in this paper. At locations where underground bonding conductors were not practical to install, bonding of structural steel members with metallic conduits for feeder cables that carry equipment grounding conductors between the main switchboard and various power panels act as bonding conductors.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信