{"title":"解除管制的电力市场中的计划外流动:弥合西方电力工业与学术界之间的差距","authors":"A. Dozier, S. Suryanarayanan, Joseph P. Liberatore, Matthew C. Veghte","doi":"10.1109/GREENTECH.2013.75","DOIUrl":null,"url":null,"abstract":"Unscheduled power flows cause inequitable compensation of transmission infrastructure usage as well as a less reliable system. Accordingly, an unspecified amount of dollars in the United States are lost annually to unscheduled flows. A comprehensive survey of the literature on methods used to handle unscheduled flow in the market and the system is provided in this paper. Advantages and disadvantages are discussed with specific regard to the system and operating considerations within the Western Interconnection of the United States bulk electric system. Operating challenges within the Western Interconnection are briefly introduced. An action plan for including any of the proposed unscheduled flow mitigation mechanisms within the Western Interconnection is recommended, which includes guidance from a regulatory agency, infrastructure enhancements, and modeling efforts to determine associated impacts of the most promising methods prior to implementation.","PeriodicalId":311325,"journal":{"name":"2013 IEEE Green Technologies Conference (GreenTech)","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Unscheduled Flow in Deregulated Electricity Markets: Bridging the Gap between the Western Electric Power Industry and Academia\",\"authors\":\"A. Dozier, S. Suryanarayanan, Joseph P. Liberatore, Matthew C. Veghte\",\"doi\":\"10.1109/GREENTECH.2013.75\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Unscheduled power flows cause inequitable compensation of transmission infrastructure usage as well as a less reliable system. Accordingly, an unspecified amount of dollars in the United States are lost annually to unscheduled flows. A comprehensive survey of the literature on methods used to handle unscheduled flow in the market and the system is provided in this paper. Advantages and disadvantages are discussed with specific regard to the system and operating considerations within the Western Interconnection of the United States bulk electric system. Operating challenges within the Western Interconnection are briefly introduced. An action plan for including any of the proposed unscheduled flow mitigation mechanisms within the Western Interconnection is recommended, which includes guidance from a regulatory agency, infrastructure enhancements, and modeling efforts to determine associated impacts of the most promising methods prior to implementation.\",\"PeriodicalId\":311325,\"journal\":{\"name\":\"2013 IEEE Green Technologies Conference (GreenTech)\",\"volume\":\"49 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-04-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 IEEE Green Technologies Conference (GreenTech)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/GREENTECH.2013.75\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE Green Technologies Conference (GreenTech)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/GREENTECH.2013.75","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

计划外的电力流动导致输电基础设施使用补偿不公平以及系统可靠性降低。因此,在美国,每年有数额不详的美元因计划外流动而流失。本文对用于处理市场和系统中计划外流量的方法的文献进行了全面的调查。针对美国大容量电力系统西部互联的系统和运行考虑,讨论了优点和缺点。简要介绍了西部互联的运营挑战。建议制定一项行动计划,将任何拟议的计划外流量缓解机制纳入西部互联,其中包括监管机构的指导、基础设施的增强和建模工作,以确定实施前最有希望的方法的相关影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Unscheduled Flow in Deregulated Electricity Markets: Bridging the Gap between the Western Electric Power Industry and Academia
Unscheduled power flows cause inequitable compensation of transmission infrastructure usage as well as a less reliable system. Accordingly, an unspecified amount of dollars in the United States are lost annually to unscheduled flows. A comprehensive survey of the literature on methods used to handle unscheduled flow in the market and the system is provided in this paper. Advantages and disadvantages are discussed with specific regard to the system and operating considerations within the Western Interconnection of the United States bulk electric system. Operating challenges within the Western Interconnection are briefly introduced. An action plan for including any of the proposed unscheduled flow mitigation mechanisms within the Western Interconnection is recommended, which includes guidance from a regulatory agency, infrastructure enhancements, and modeling efforts to determine associated impacts of the most promising methods prior to implementation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信