永仁-阜宁直流直流线路故障恢复控制策略优化研究

Yukun Zhu, Libin Huang, Shuyong Li, Yihua Zhu, Yantao Song, Ren Liu
{"title":"永仁-阜宁直流直流线路故障恢复控制策略优化研究","authors":"Yukun Zhu, Libin Huang, Shuyong Li, Yihua Zhu, Yantao Song, Ren Liu","doi":"10.1109/EI256261.2022.10116792","DOIUrl":null,"url":null,"abstract":"The ±500kV Yongren-Funing HVDC transmission project is the first HVDC project whose sending and receiving ends are both located in the same province. When DC line fault happened under the condition of inter-communication fault between the pole control systems of the rectifier and inverter stations, the HVDC system cannot be blocked because of the frequent repeating actions of the DC line fault recovery in the inverter station. In order to solve the problem, an optimal control strategy of direct blocking HVDC system was proposed to solve the above issue. The optimization control strategy was verified by RTDS simulation. The simulation results showed that the proposed optimization control strategy of the DC line fault recovery could solve the above problems effectively. The proposed strategy has already been implemented on site permanently, which has great significance for the HVDC/UHVDC transmission projects in operation currently.","PeriodicalId":413409,"journal":{"name":"2022 IEEE 6th Conference on Energy Internet and Energy System Integration (EI2)","volume":"254 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimization Study on the Control Strategy of DC Line Fault Recovery for Yongren-Funing HVDC\",\"authors\":\"Yukun Zhu, Libin Huang, Shuyong Li, Yihua Zhu, Yantao Song, Ren Liu\",\"doi\":\"10.1109/EI256261.2022.10116792\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The ±500kV Yongren-Funing HVDC transmission project is the first HVDC project whose sending and receiving ends are both located in the same province. When DC line fault happened under the condition of inter-communication fault between the pole control systems of the rectifier and inverter stations, the HVDC system cannot be blocked because of the frequent repeating actions of the DC line fault recovery in the inverter station. In order to solve the problem, an optimal control strategy of direct blocking HVDC system was proposed to solve the above issue. The optimization control strategy was verified by RTDS simulation. The simulation results showed that the proposed optimization control strategy of the DC line fault recovery could solve the above problems effectively. The proposed strategy has already been implemented on site permanently, which has great significance for the HVDC/UHVDC transmission projects in operation currently.\",\"PeriodicalId\":413409,\"journal\":{\"name\":\"2022 IEEE 6th Conference on Energy Internet and Energy System Integration (EI2)\",\"volume\":\"254 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 IEEE 6th Conference on Energy Internet and Energy System Integration (EI2)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EI256261.2022.10116792\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE 6th Conference on Energy Internet and Energy System Integration (EI2)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EI256261.2022.10116792","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

±500kV永仁-阜宁直流输电工程是我国首个送、收两端均位于省内的高压直流输电工程。在整流站和逆变站极控系统间通信故障的情况下发生直流线路故障时,由于逆变站直流线路故障恢复的频繁重复动作,使得高压直流系统无法阻塞。为了解决这一问题,提出了一种直接阻塞直流系统的最优控制策略。通过RTDS仿真验证了优化控制策略。仿真结果表明,所提出的直流线路故障恢复优化控制策略能够有效地解决上述问题。该策略已在现场永久实施,对当前运行中的高压直流/特高压直流输电工程具有重要意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimization Study on the Control Strategy of DC Line Fault Recovery for Yongren-Funing HVDC
The ±500kV Yongren-Funing HVDC transmission project is the first HVDC project whose sending and receiving ends are both located in the same province. When DC line fault happened under the condition of inter-communication fault between the pole control systems of the rectifier and inverter stations, the HVDC system cannot be blocked because of the frequent repeating actions of the DC line fault recovery in the inverter station. In order to solve the problem, an optimal control strategy of direct blocking HVDC system was proposed to solve the above issue. The optimization control strategy was verified by RTDS simulation. The simulation results showed that the proposed optimization control strategy of the DC line fault recovery could solve the above problems effectively. The proposed strategy has already been implemented on site permanently, which has great significance for the HVDC/UHVDC transmission projects in operation currently.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信