从施工管理的角度探讨设计施工合同对场馆工程风险审计方法标准的影响

Ega Alvian Sutekat, A. Putro, Y. Latief
{"title":"从施工管理的角度探讨设计施工合同对场馆工程风险审计方法标准的影响","authors":"Ega Alvian Sutekat, A. Putro, Y. Latief","doi":"10.46729/ijstm.v4i4.863","DOIUrl":null,"url":null,"abstract":"The Design and Build method have been widely used in government projects in recent years. The construction of a sports stadium is one type of project that uses an integrated contract. Design and build, which is considered to have high complexity and is urgent, so the use of the Design and Build method is expected to provide a solution in the implementation of the project. However, in implementing the integrated design and construction contract, there are still many disputes from stakeholders involved such as Inspection of Work Results. This study aims to identify the factors that cause dispute in the Design and Build project and develop a Standard for Inspection of Work Results from the perspective of Construction Management. The results of the study indicate the factors causing the dominant risk-based dispute as well as corrective action in the form of standard inspection of work results on construction projects.","PeriodicalId":384527,"journal":{"name":"International Journal of Science, Technology & Management","volume":"264 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development Of Risk-Based Audit Method Standard For Stadium Project Using Design And Build Contract To Minimize Dispute From Construction Management Point Of View\",\"authors\":\"Ega Alvian Sutekat, A. Putro, Y. Latief\",\"doi\":\"10.46729/ijstm.v4i4.863\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Design and Build method have been widely used in government projects in recent years. The construction of a sports stadium is one type of project that uses an integrated contract. Design and build, which is considered to have high complexity and is urgent, so the use of the Design and Build method is expected to provide a solution in the implementation of the project. However, in implementing the integrated design and construction contract, there are still many disputes from stakeholders involved such as Inspection of Work Results. This study aims to identify the factors that cause dispute in the Design and Build project and develop a Standard for Inspection of Work Results from the perspective of Construction Management. The results of the study indicate the factors causing the dominant risk-based dispute as well as corrective action in the form of standard inspection of work results on construction projects.\",\"PeriodicalId\":384527,\"journal\":{\"name\":\"International Journal of Science, Technology & Management\",\"volume\":\"264 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Science, Technology & Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.46729/ijstm.v4i4.863\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Science, Technology & Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46729/ijstm.v4i4.863","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

近年来,设计与建造方法在政府工程项目中得到了广泛的应用。体育场馆建设是综合承包工程的一种。设计和构建,这被认为具有很高的复杂性和紧迫性,因此使用设计和构建方法有望在项目的实施中提供解决方案。然而,在实施设计与施工一体化合同过程中,仍存在诸多利益相关方之间的争议,如工作成果检验等。本研究旨在从施工管理的角度,找出设计与施工项目中产生争议的因素,并制定一套工程成果检验标准。研究结果指出了造成主要风险纠纷的因素,以及以工程成果标准检验的形式采取的纠正措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Development Of Risk-Based Audit Method Standard For Stadium Project Using Design And Build Contract To Minimize Dispute From Construction Management Point Of View
The Design and Build method have been widely used in government projects in recent years. The construction of a sports stadium is one type of project that uses an integrated contract. Design and build, which is considered to have high complexity and is urgent, so the use of the Design and Build method is expected to provide a solution in the implementation of the project. However, in implementing the integrated design and construction contract, there are still many disputes from stakeholders involved such as Inspection of Work Results. This study aims to identify the factors that cause dispute in the Design and Build project and develop a Standard for Inspection of Work Results from the perspective of Construction Management. The results of the study indicate the factors causing the dominant risk-based dispute as well as corrective action in the form of standard inspection of work results on construction projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信