用CPLEX优化方法对支切法炼钢和连铸工艺进行了调度

Liangliang Sun, W. Liu, Baoxing Xu, T. Chai
{"title":"用CPLEX优化方法对支切法炼钢和连铸工艺进行了调度","authors":"Liangliang Sun, W. Liu, Baoxing Xu, T. Chai","doi":"10.1109/ICCIT.2010.5711147","DOIUrl":null,"url":null,"abstract":"The steel-making and continuous casting process is the connection between the iron process and the rolling process; it is the bottleneck in the iron and steel production. A better scheduling of this process is the key factor to ensure the whole production in a well-organized rhythm for iron and steel production manufacturing productivity. The branch and cut method in the standard commercial solver CPLEX is introduced to solve the scheduling problem. The linearization methods for the linear conversion are highlighted. Due to the limited calculation time requirement about the scheduling results and the scale of the problem, special methods for the efficiency tuning are applied according to the characters of the problem. Numerical testing supported by Shanghai Bashan steel plant demonstrated that the computational results show significant improvement compared to the traditional manual scheduling results.","PeriodicalId":131337,"journal":{"name":"5th International Conference on Computer Sciences and Convergence Information Technology","volume":"148 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"The scheduling of steel-making and continuous casting process using branch and cut method via CPLEX optimization\",\"authors\":\"Liangliang Sun, W. Liu, Baoxing Xu, T. Chai\",\"doi\":\"10.1109/ICCIT.2010.5711147\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The steel-making and continuous casting process is the connection between the iron process and the rolling process; it is the bottleneck in the iron and steel production. A better scheduling of this process is the key factor to ensure the whole production in a well-organized rhythm for iron and steel production manufacturing productivity. The branch and cut method in the standard commercial solver CPLEX is introduced to solve the scheduling problem. The linearization methods for the linear conversion are highlighted. Due to the limited calculation time requirement about the scheduling results and the scale of the problem, special methods for the efficiency tuning are applied according to the characters of the problem. Numerical testing supported by Shanghai Bashan steel plant demonstrated that the computational results show significant improvement compared to the traditional manual scheduling results.\",\"PeriodicalId\":131337,\"journal\":{\"name\":\"5th International Conference on Computer Sciences and Convergence Information Technology\",\"volume\":\"148 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"5th International Conference on Computer Sciences and Convergence Information Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCIT.2010.5711147\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"5th International Conference on Computer Sciences and Convergence Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCIT.2010.5711147","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

炼钢连铸工艺是炼铁工艺与轧制工艺的连接;这是钢铁生产的瓶颈。对这一过程进行更好的调度,是保证整个生产过程井然有序,提高钢铁生产生产效率的关键因素。引入标准商用求解器CPLEX中的分支切割法来求解调度问题。重点介绍了线性转换的线性化方法。由于调度结果的计算时间要求和问题的规模有限,根据问题的特点,采用了特殊的效率调优方法。上海巴山钢铁厂的数值试验表明,与传统的人工调度结果相比,计算结果有明显改善。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The scheduling of steel-making and continuous casting process using branch and cut method via CPLEX optimization
The steel-making and continuous casting process is the connection between the iron process and the rolling process; it is the bottleneck in the iron and steel production. A better scheduling of this process is the key factor to ensure the whole production in a well-organized rhythm for iron and steel production manufacturing productivity. The branch and cut method in the standard commercial solver CPLEX is introduced to solve the scheduling problem. The linearization methods for the linear conversion are highlighted. Due to the limited calculation time requirement about the scheduling results and the scale of the problem, special methods for the efficiency tuning are applied according to the characters of the problem. Numerical testing supported by Shanghai Bashan steel plant demonstrated that the computational results show significant improvement compared to the traditional manual scheduling results.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信