根据ANSI/IEEE和IEC标准计算发电机电源短路电流,并进行EMTP验证

J. Das
{"title":"根据ANSI/IEEE和IEC标准计算发电机电源短路电流,并进行EMTP验证","authors":"J. Das","doi":"10.1109/PAPCON.2009.5185412","DOIUrl":null,"url":null,"abstract":"For the interruption of a large generator source-short-circuit current, a current zero may not be obtained at the contact parting time of the circuit breaker. Large generators which have high X/R ratio, and depending upon the relative impedances and time constants the dc component can be higher than the ac decaying component delaying the occurrence of current zero well beyond contact parting time of the circuit breaker. The subject is well addressed in the current literature, though not the calculations of it. This paper presents calculations of a large practical generator using ANSI/IEEE and IEC standards with verifications of results using EMTP. It demonstrates large differences which impact the selection of generator circuit breaker interrupting duties.","PeriodicalId":217420,"journal":{"name":"Conference Record of 2009 Annual Pulp and Paper Industry Technical Conference","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-06-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Calculations of generator source short- circuit current according to ANSI/IEEE and IEC standards, with EMTP verifications\",\"authors\":\"J. Das\",\"doi\":\"10.1109/PAPCON.2009.5185412\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"For the interruption of a large generator source-short-circuit current, a current zero may not be obtained at the contact parting time of the circuit breaker. Large generators which have high X/R ratio, and depending upon the relative impedances and time constants the dc component can be higher than the ac decaying component delaying the occurrence of current zero well beyond contact parting time of the circuit breaker. The subject is well addressed in the current literature, though not the calculations of it. This paper presents calculations of a large practical generator using ANSI/IEEE and IEC standards with verifications of results using EMTP. It demonstrates large differences which impact the selection of generator circuit breaker interrupting duties.\",\"PeriodicalId\":217420,\"journal\":{\"name\":\"Conference Record of 2009 Annual Pulp and Paper Industry Technical Conference\",\"volume\":\"41 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-06-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Record of 2009 Annual Pulp and Paper Industry Technical Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PAPCON.2009.5185412\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record of 2009 Annual Pulp and Paper Industry Technical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAPCON.2009.5185412","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

对于大的发电机源短路电流的中断,在断路器触点分离时刻可能得不到电流零。具有高X/R比的大型发电机,并且取决于相对阻抗和时间常数,直流分量可以高于交流衰减分量,延迟电流零的发生,远远超过断路器的触点分离时间。这个主题在当前的文献中得到了很好的论述,尽管没有对其进行计算。本文介绍了采用ANSI/IEEE和IEC标准对某大型实际发电机进行的计算,并用EMTP对计算结果进行了验证。结果表明,两者之间存在较大差异,影响了发电机断路器断路作用的选择。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Calculations of generator source short- circuit current according to ANSI/IEEE and IEC standards, with EMTP verifications
For the interruption of a large generator source-short-circuit current, a current zero may not be obtained at the contact parting time of the circuit breaker. Large generators which have high X/R ratio, and depending upon the relative impedances and time constants the dc component can be higher than the ac decaying component delaying the occurrence of current zero well beyond contact parting time of the circuit breaker. The subject is well addressed in the current literature, though not the calculations of it. This paper presents calculations of a large practical generator using ANSI/IEEE and IEC standards with verifications of results using EMTP. It demonstrates large differences which impact the selection of generator circuit breaker interrupting duties.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信