{"title":"集装箱码头泊位、岸吊、内车分配的新方法","authors":"A. Karam, A. Eltawil","doi":"10.1109/LISS.2015.7369644","DOIUrl":null,"url":null,"abstract":"This paper proposes a new solution for the simultaneous berth allocation, quay crane assignments and internal truck assignments to quay cranes problems in a container terminal. The insufficient number of internal trucks may cause a delay in transporting containers between the quay side and the storage yard, resulting in low productivity of the quay cranes which in turn affects the handling times of vessels. While most of related studies assume that internal trucks are always available, this paper considers the limited availability of internal trucks when estimating the handling times of vessels. A mixed integer programming model is proposed to simultaneously solve the berth allocation problem, quay crane assignment problem, specific quay crane assignment problem and the assignments of internal truck to each quay crane. Validation of the model against an existing approach is conducted under condition that internal trucks are available. Moreover, the proposed model is validated against a queuing model from literature in case of limited availability of internal trucks.","PeriodicalId":124091,"journal":{"name":"2015 International Conference on Logistics, Informatics and Service Sciences (LISS)","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"A new method for allocating berths, quay cranes and internal trucks in container terminals\",\"authors\":\"A. Karam, A. Eltawil\",\"doi\":\"10.1109/LISS.2015.7369644\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper proposes a new solution for the simultaneous berth allocation, quay crane assignments and internal truck assignments to quay cranes problems in a container terminal. The insufficient number of internal trucks may cause a delay in transporting containers between the quay side and the storage yard, resulting in low productivity of the quay cranes which in turn affects the handling times of vessels. While most of related studies assume that internal trucks are always available, this paper considers the limited availability of internal trucks when estimating the handling times of vessels. A mixed integer programming model is proposed to simultaneously solve the berth allocation problem, quay crane assignment problem, specific quay crane assignment problem and the assignments of internal truck to each quay crane. Validation of the model against an existing approach is conducted under condition that internal trucks are available. Moreover, the proposed model is validated against a queuing model from literature in case of limited availability of internal trucks.\",\"PeriodicalId\":124091,\"journal\":{\"name\":\"2015 International Conference on Logistics, Informatics and Service Sciences (LISS)\",\"volume\":\"56 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-07-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on Logistics, Informatics and Service Sciences (LISS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/LISS.2015.7369644\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Logistics, Informatics and Service Sciences (LISS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/LISS.2015.7369644","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A new method for allocating berths, quay cranes and internal trucks in container terminals
This paper proposes a new solution for the simultaneous berth allocation, quay crane assignments and internal truck assignments to quay cranes problems in a container terminal. The insufficient number of internal trucks may cause a delay in transporting containers between the quay side and the storage yard, resulting in low productivity of the quay cranes which in turn affects the handling times of vessels. While most of related studies assume that internal trucks are always available, this paper considers the limited availability of internal trucks when estimating the handling times of vessels. A mixed integer programming model is proposed to simultaneously solve the berth allocation problem, quay crane assignment problem, specific quay crane assignment problem and the assignments of internal truck to each quay crane. Validation of the model against an existing approach is conducted under condition that internal trucks are available. Moreover, the proposed model is validated against a queuing model from literature in case of limited availability of internal trucks.