{"title":"多模式重复项目调度的多目标优化","authors":"Wei-xin Wang, Hua Meng, Haoming Wang, Jiafu Su","doi":"10.1145/3460824.3460831","DOIUrl":null,"url":null,"abstract":"Multi-objective optimization of repetitive project scheduling problem with resource effectiveness is addressed. This problem considers the influence of the duration under work continuity and non-continuity, in order to comply with the relationship of project cost, project makespan and resource effectiveness. To solve the problem, multi-objective repetitive project scheduling model is proposed, and an cloud genetic algorithm is designed, which uses randomness and stability of Normal Cloud Model to generate priority of repetitive project scheduling activities and obtain repetitive project scheduling plan. The results showed that, in repetitive projects under work continuity and non-continuity, the performance comparison shows that the cloud genetic algorithm significantly outperforms the previous multi-objective algorithm.","PeriodicalId":315518,"journal":{"name":"Proceedings of the 2021 3rd International Conference on Management Science and Industrial Engineering","volume":"186 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Multi-objective Optimization of Multi-Mode Repetitive Project Scheduling\",\"authors\":\"Wei-xin Wang, Hua Meng, Haoming Wang, Jiafu Su\",\"doi\":\"10.1145/3460824.3460831\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Multi-objective optimization of repetitive project scheduling problem with resource effectiveness is addressed. This problem considers the influence of the duration under work continuity and non-continuity, in order to comply with the relationship of project cost, project makespan and resource effectiveness. To solve the problem, multi-objective repetitive project scheduling model is proposed, and an cloud genetic algorithm is designed, which uses randomness and stability of Normal Cloud Model to generate priority of repetitive project scheduling activities and obtain repetitive project scheduling plan. The results showed that, in repetitive projects under work continuity and non-continuity, the performance comparison shows that the cloud genetic algorithm significantly outperforms the previous multi-objective algorithm.\",\"PeriodicalId\":315518,\"journal\":{\"name\":\"Proceedings of the 2021 3rd International Conference on Management Science and Industrial Engineering\",\"volume\":\"186 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-04-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 2021 3rd International Conference on Management Science and Industrial Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3460824.3460831\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2021 3rd International Conference on Management Science and Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3460824.3460831","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Multi-objective Optimization of Multi-Mode Repetitive Project Scheduling
Multi-objective optimization of repetitive project scheduling problem with resource effectiveness is addressed. This problem considers the influence of the duration under work continuity and non-continuity, in order to comply with the relationship of project cost, project makespan and resource effectiveness. To solve the problem, multi-objective repetitive project scheduling model is proposed, and an cloud genetic algorithm is designed, which uses randomness and stability of Normal Cloud Model to generate priority of repetitive project scheduling activities and obtain repetitive project scheduling plan. The results showed that, in repetitive projects under work continuity and non-continuity, the performance comparison shows that the cloud genetic algorithm significantly outperforms the previous multi-objective algorithm.