{"title":"真正的绿色环保机器(a)","authors":"Brandt R. Allen, Luann J. Lynch","doi":"10.2139/ssrn.1417165","DOIUrl":null,"url":null,"abstract":"A large bank is attempting to cost justify a proposed, large (60,000 sq. ft.) data center based upon energy savings achieved through \"green\" technology, principally through water cooling and energy recovery. The investments total about $100 million, offset somewhat by funds recouped from the closing of an older facility. The new building is expected to open with 700 racks of server computers. The power consumed by each rack costs more than the amortized cost of the computers themselves. The bank expects a 12% return on discounted cash flows.","PeriodicalId":319003,"journal":{"name":"ERPN: Case Studies (Sub-Topic)","volume":"1006 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Real Green it Machine (a)\",\"authors\":\"Brandt R. Allen, Luann J. Lynch\",\"doi\":\"10.2139/ssrn.1417165\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A large bank is attempting to cost justify a proposed, large (60,000 sq. ft.) data center based upon energy savings achieved through \\\"green\\\" technology, principally through water cooling and energy recovery. The investments total about $100 million, offset somewhat by funds recouped from the closing of an older facility. The new building is expected to open with 700 racks of server computers. The power consumed by each rack costs more than the amortized cost of the computers themselves. The bank expects a 12% return on discounted cash flows.\",\"PeriodicalId\":319003,\"journal\":{\"name\":\"ERPN: Case Studies (Sub-Topic)\",\"volume\":\"1006 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-06-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ERPN: Case Studies (Sub-Topic)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.1417165\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ERPN: Case Studies (Sub-Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.1417165","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

一家大型银行正试图为拟议中的大型(6万平方英尺)项目提供成本证明。通过“绿色”技术(主要是水冷却和能源回收)实现节能。投资总额约为1亿美元,由关闭一个较旧设施所收回的资金部分抵消。新大楼预计将拥有700个服务器机架。每个机架消耗的电力成本比计算机本身的平摊成本还要高。该行预计现金流折现回报率为12%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Real Green it Machine (a)
A large bank is attempting to cost justify a proposed, large (60,000 sq. ft.) data center based upon energy savings achieved through "green" technology, principally through water cooling and energy recovery. The investments total about $100 million, offset somewhat by funds recouped from the closing of an older facility. The new building is expected to open with 700 racks of server computers. The power consumed by each rack costs more than the amortized cost of the computers themselves. The bank expects a 12% return on discounted cash flows.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信