铁路系统电力系统资产管理

Tan Yong Peow, Loi Boon Toon, S. Goh
{"title":"铁路系统电力系统资产管理","authors":"Tan Yong Peow, Loi Boon Toon, S. Goh","doi":"10.1109/IPEC.2005.206977","DOIUrl":null,"url":null,"abstract":"The project life cycle of the power system in the railway system starts from the concept study on the power system and its requirements. The study focuses on critical engineering and operational requirements like EMC, earthing and bonding system, stray current, emergency loadings, uninterrupted power requirements etc. The paper presents the project life-cycle of an integrated asset and design management of the power system in a railway system. The lifecycle stages starts from concept study to the decommissioning of the system. Asset management study is carried out on how the equipment maintenance and replacement are tracked by a maintenance management tool. The life-cycle carries on to design, procurement, manufacturing, installation, testing, operation and asset replacement","PeriodicalId":164802,"journal":{"name":"2005 International Power Engineering Conference","volume":"120 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Asset management of the power system in a rail system\",\"authors\":\"Tan Yong Peow, Loi Boon Toon, S. Goh\",\"doi\":\"10.1109/IPEC.2005.206977\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The project life cycle of the power system in the railway system starts from the concept study on the power system and its requirements. The study focuses on critical engineering and operational requirements like EMC, earthing and bonding system, stray current, emergency loadings, uninterrupted power requirements etc. The paper presents the project life-cycle of an integrated asset and design management of the power system in a railway system. The lifecycle stages starts from concept study to the decommissioning of the system. Asset management study is carried out on how the equipment maintenance and replacement are tracked by a maintenance management tool. The life-cycle carries on to design, procurement, manufacturing, installation, testing, operation and asset replacement\",\"PeriodicalId\":164802,\"journal\":{\"name\":\"2005 International Power Engineering Conference\",\"volume\":\"120 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2005 International Power Engineering Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IPEC.2005.206977\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005 International Power Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IPEC.2005.206977","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

铁路系统中电力系统的项目生命周期是从对电力系统及其需求的概念研究出发的。该研究侧重于关键的工程和操作要求,如EMC、接地和bonding系统、杂散电流、应急负载、不间断电源要求等。本文介绍了铁路综合资产的项目生命周期及电力系统的设计管理。生命周期阶段从概念研究到系统退役。资产管理研究如何通过维护管理工具跟踪设备的维护和更换。生命周期从设计、采购、制造、安装、测试、运行到资产更换
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Asset management of the power system in a rail system
The project life cycle of the power system in the railway system starts from the concept study on the power system and its requirements. The study focuses on critical engineering and operational requirements like EMC, earthing and bonding system, stray current, emergency loadings, uninterrupted power requirements etc. The paper presents the project life-cycle of an integrated asset and design management of the power system in a railway system. The lifecycle stages starts from concept study to the decommissioning of the system. Asset management study is carried out on how the equipment maintenance and replacement are tracked by a maintenance management tool. The life-cycle carries on to design, procurement, manufacturing, installation, testing, operation and asset replacement
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信