考虑电厂负荷变化响应的电力发展规划

Sasipa Vongsurapaitoon, K. Audomvongseree
{"title":"考虑电厂负荷变化响应的电力发展规划","authors":"Sasipa Vongsurapaitoon, K. Audomvongseree","doi":"10.1109/ECTICON.2017.8096202","DOIUrl":null,"url":null,"abstract":"As Thailand's electricity demand increases, the country's power supply must meet this new demand. An increasing portion of energy production from renewables will lead to a drastic change in net demand characteristic on traditional power supplies. If the overall power plants in the system cannot respond to this fluctuating and uncertain demand, it may cause generation demand to be unbalanced and lead to system instability. Therefore, this paper proposes a new power development planning method that considers power plant response to load change. The key factor determining whether a power grid requires a new plant are reliability indexes such as Loss of Load Expectation (LOLE) and Reserved Margin (RM). Then type of power plants suited for different load demand patterns is identified. To illustrate the advantage of the proposed method, new power development plan (PDP) done by the proposed method is then compared to the Thailand's current plan, PDP2015.","PeriodicalId":273911,"journal":{"name":"2017 14th International Conference on Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology (ECTI-CON)","volume":"51 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Power development planning considering power plant response to load change\",\"authors\":\"Sasipa Vongsurapaitoon, K. Audomvongseree\",\"doi\":\"10.1109/ECTICON.2017.8096202\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As Thailand's electricity demand increases, the country's power supply must meet this new demand. An increasing portion of energy production from renewables will lead to a drastic change in net demand characteristic on traditional power supplies. If the overall power plants in the system cannot respond to this fluctuating and uncertain demand, it may cause generation demand to be unbalanced and lead to system instability. Therefore, this paper proposes a new power development planning method that considers power plant response to load change. The key factor determining whether a power grid requires a new plant are reliability indexes such as Loss of Load Expectation (LOLE) and Reserved Margin (RM). Then type of power plants suited for different load demand patterns is identified. To illustrate the advantage of the proposed method, new power development plan (PDP) done by the proposed method is then compared to the Thailand's current plan, PDP2015.\",\"PeriodicalId\":273911,\"journal\":{\"name\":\"2017 14th International Conference on Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology (ECTI-CON)\",\"volume\":\"51 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 14th International Conference on Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology (ECTI-CON)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ECTICON.2017.8096202\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 14th International Conference on Electrical Engineering/Electronics, Computer, Telecommunications and Information Technology (ECTI-CON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ECTICON.2017.8096202","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

随着泰国电力需求的增加,该国的电力供应必须满足这一新的需求。可再生能源在能源生产中所占比例的增加,将导致传统电力供应的净需求特征发生巨大变化。如果系统中的整个电厂不能对这种波动的、不确定的需求做出反应,就可能导致发电需求不平衡,从而导致系统不稳定。为此,本文提出了一种考虑电厂负荷变化响应的电力发展规划新方法。决定电网是否需要新建电厂的关键因素是负荷预期损失(LOLE)和预留余量(RM)等可靠性指标。然后确定适合不同负荷需求模式的电厂类型。为了说明所提出的方法的优势,然后将所提出的方法完成的新电力开发计划(PDP)与泰国目前的计划PDP2015进行比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Power development planning considering power plant response to load change
As Thailand's electricity demand increases, the country's power supply must meet this new demand. An increasing portion of energy production from renewables will lead to a drastic change in net demand characteristic on traditional power supplies. If the overall power plants in the system cannot respond to this fluctuating and uncertain demand, it may cause generation demand to be unbalanced and lead to system instability. Therefore, this paper proposes a new power development planning method that considers power plant response to load change. The key factor determining whether a power grid requires a new plant are reliability indexes such as Loss of Load Expectation (LOLE) and Reserved Margin (RM). Then type of power plants suited for different load demand patterns is identified. To illustrate the advantage of the proposed method, new power development plan (PDP) done by the proposed method is then compared to the Thailand's current plan, PDP2015.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信