利用数字地理空间数据进行道路基础设施规划

S. Špica, Milan Čeliković, Srdan Popov
{"title":"利用数字地理空间数据进行道路基础设施规划","authors":"S. Špica, Milan Čeliković, Srdan Popov","doi":"10.1109/TELFOR56187.2022.9983669","DOIUrl":null,"url":null,"abstract":"Presented study introduces the software implementation of the Georeferenced Information System of power grid infrastructure in the vicinity of State Road IB 34 in the Republic of Serbia. The exact locations of power substations and traces of HV overhead lines are used in the form of Geospatial data (GeoJSON), in order to determine the optimal power supply of road infrastructure and to avoid interference with the HV power grid. Appropriate georeferenced and technical data can greatly improve the quality and reliability of newly planned low-voltage power installations needed for safe public transport. This will give rise to more economical and timesaving supervision of the state road IB 34 power installation system.","PeriodicalId":277553,"journal":{"name":"2022 30th Telecommunications Forum (TELFOR)","volume":"38 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Road Infrastructure Planning Using Digital Geospatial Data\",\"authors\":\"S. Špica, Milan Čeliković, Srdan Popov\",\"doi\":\"10.1109/TELFOR56187.2022.9983669\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Presented study introduces the software implementation of the Georeferenced Information System of power grid infrastructure in the vicinity of State Road IB 34 in the Republic of Serbia. The exact locations of power substations and traces of HV overhead lines are used in the form of Geospatial data (GeoJSON), in order to determine the optimal power supply of road infrastructure and to avoid interference with the HV power grid. Appropriate georeferenced and technical data can greatly improve the quality and reliability of newly planned low-voltage power installations needed for safe public transport. This will give rise to more economical and timesaving supervision of the state road IB 34 power installation system.\",\"PeriodicalId\":277553,\"journal\":{\"name\":\"2022 30th Telecommunications Forum (TELFOR)\",\"volume\":\"38 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 30th Telecommunications Forum (TELFOR)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TELFOR56187.2022.9983669\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 30th Telecommunications Forum (TELFOR)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TELFOR56187.2022.9983669","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究介绍了塞尔维亚共和国ib34国道附近电网基础设施地理参考信息系统的软件实现。变电站的准确位置和高压架空线路的轨迹以地理空间数据(GeoJSON)的形式使用,以确定道路基础设施的最佳供电,避免对高压电网的干扰。适当的地理参考和技术数据可以大大提高安全公共交通所需的新规划低压电力装置的质量和可靠性。这将使国道ib34电力安装系统的监理更加经济、省时。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Road Infrastructure Planning Using Digital Geospatial Data
Presented study introduces the software implementation of the Georeferenced Information System of power grid infrastructure in the vicinity of State Road IB 34 in the Republic of Serbia. The exact locations of power substations and traces of HV overhead lines are used in the form of Geospatial data (GeoJSON), in order to determine the optimal power supply of road infrastructure and to avoid interference with the HV power grid. Appropriate georeferenced and technical data can greatly improve the quality and reliability of newly planned low-voltage power installations needed for safe public transport. This will give rise to more economical and timesaving supervision of the state road IB 34 power installation system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信