多瑙河-奥得河-易北河运河与捷克共和国军队有关的问题

Martin Sedlácek, J. Zelený
{"title":"多瑙河-奥得河-易北河运河与捷克共和国军队有关的问题","authors":"Martin Sedlácek, J. Zelený","doi":"10.1109/ICMT52455.2021.9502758","DOIUrl":null,"url":null,"abstract":"The article deals with problematic aspects of the planned construction of the Danube-Oder-Elbe (D-O-L) canal in terms of wet gap crossing by the army of the Czech republic (ACR) outside the permanent bridges and the possibilities of wet gap crossing as one of the tasks of engineer support. The article further mainly deals with the influence of the canal profile on the possibility of establishing crossing sites in the conditions of available (selected combat and transport) means of the ACR. Furthermore, the article presents calculations of the use of ACR means to establish a selected and modeled crossing sites and also models a proposal to modify the profile for the establishment of bridge, vessel, ferry and underwater crossing sites as elements of military temporary road bridges in the operational preparation of the state territory (OPSÚ). The construction of the designed and modified profile of the water corridor is the main benefit of the article, as it points to the possibilities of establishing crossing sites.","PeriodicalId":276923,"journal":{"name":"2021 International Conference on Military Technologies (ICMT)","volume":"129 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Problematic Aspects of the Danube-Oder-Elbe Canal in Connection with the Army of the Czech Republic\",\"authors\":\"Martin Sedlácek, J. Zelený\",\"doi\":\"10.1109/ICMT52455.2021.9502758\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article deals with problematic aspects of the planned construction of the Danube-Oder-Elbe (D-O-L) canal in terms of wet gap crossing by the army of the Czech republic (ACR) outside the permanent bridges and the possibilities of wet gap crossing as one of the tasks of engineer support. The article further mainly deals with the influence of the canal profile on the possibility of establishing crossing sites in the conditions of available (selected combat and transport) means of the ACR. Furthermore, the article presents calculations of the use of ACR means to establish a selected and modeled crossing sites and also models a proposal to modify the profile for the establishment of bridge, vessel, ferry and underwater crossing sites as elements of military temporary road bridges in the operational preparation of the state territory (OPSÚ). The construction of the designed and modified profile of the water corridor is the main benefit of the article, as it points to the possibilities of establishing crossing sites.\",\"PeriodicalId\":276923,\"journal\":{\"name\":\"2021 International Conference on Military Technologies (ICMT)\",\"volume\":\"129 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 International Conference on Military Technologies (ICMT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICMT52455.2021.9502758\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 International Conference on Military Technologies (ICMT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMT52455.2021.9502758","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文讨论了多瑙河-奥得河-易北河(D-O-L)运河计划建设中的问题,即捷克共和国军队(ACR)在永久性桥梁之外的湿隙穿越,以及作为工程师支持任务之一的湿隙穿越的可能性。本文进一步主要讨论了运河剖面对在可用的(选定的作战和运输)陆上交通工具条件下建立渡口的可能性的影响。此外,本文还介绍了使用ACR手段建立选定和模拟的渡口地点的计算,并模拟了一项建议,以修改建立桥梁、船只、渡轮和水下渡口地点的轮廓,作为国家领土作战准备中的军事临时公路桥梁的组成部分(OPSÚ)。设计和修改的水走廊剖面的建设是文章的主要好处,因为它指出了建立交叉点的可能性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Problematic Aspects of the Danube-Oder-Elbe Canal in Connection with the Army of the Czech Republic
The article deals with problematic aspects of the planned construction of the Danube-Oder-Elbe (D-O-L) canal in terms of wet gap crossing by the army of the Czech republic (ACR) outside the permanent bridges and the possibilities of wet gap crossing as one of the tasks of engineer support. The article further mainly deals with the influence of the canal profile on the possibility of establishing crossing sites in the conditions of available (selected combat and transport) means of the ACR. Furthermore, the article presents calculations of the use of ACR means to establish a selected and modeled crossing sites and also models a proposal to modify the profile for the establishment of bridge, vessel, ferry and underwater crossing sites as elements of military temporary road bridges in the operational preparation of the state territory (OPSÚ). The construction of the designed and modified profile of the water corridor is the main benefit of the article, as it points to the possibilities of establishing crossing sites.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信