NJI和BMC电机控制中心的改造和翻新

J.C. Pearson, D. Pandya
{"title":"NJI和BMC电机控制中心的改造和翻新","authors":"J.C. Pearson, D. Pandya","doi":"10.1109/EEIC.2005.1566292","DOIUrl":null,"url":null,"abstract":"This paper provides a case study of considering an economical evaluation comparing a traditional approach of completely demolishing old electrical MCCs equipment versus investigating and replacing only the malfunctioning components in the MCC. The example below illustrates how a thorough investigation of existing electrical equipment can entirely alter previous planning decisions and have a drastic impact on cost estimates. A case study detailing the revitalization of 276, thirty three year old Motor Control Center (MCC) buckets, improved safety and security for our employees and facility equipment, extended overall life of the motor control center (MCCs), enhanced skills of our employees, and saved more than one million dollars for the US Postal facility-at Jersey City, NJ","PeriodicalId":267510,"journal":{"name":"Proceedings Electrical Insulation Conference and Electrical Manufacturing Expo, 2005.","volume":"282 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Revitalizing and refurbishment of motor control centers AT NJI & BMC\",\"authors\":\"J.C. Pearson, D. Pandya\",\"doi\":\"10.1109/EEIC.2005.1566292\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper provides a case study of considering an economical evaluation comparing a traditional approach of completely demolishing old electrical MCCs equipment versus investigating and replacing only the malfunctioning components in the MCC. The example below illustrates how a thorough investigation of existing electrical equipment can entirely alter previous planning decisions and have a drastic impact on cost estimates. A case study detailing the revitalization of 276, thirty three year old Motor Control Center (MCC) buckets, improved safety and security for our employees and facility equipment, extended overall life of the motor control center (MCCs), enhanced skills of our employees, and saved more than one million dollars for the US Postal facility-at Jersey City, NJ\",\"PeriodicalId\":267510,\"journal\":{\"name\":\"Proceedings Electrical Insulation Conference and Electrical Manufacturing Expo, 2005.\",\"volume\":\"282 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings Electrical Insulation Conference and Electrical Manufacturing Expo, 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEIC.2005.1566292\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings Electrical Insulation Conference and Electrical Manufacturing Expo, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEIC.2005.1566292","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文提供了一个案例研究,考虑对传统方法进行经济评估,比较完全拆除旧电气控制系统设备与仅调查和更换控制系统中的故障部件。下面的例子说明了对现有电气设备的彻底调查如何完全改变以前的规划决策,并对成本估算产生重大影响。一个案例研究,详细介绍了276,33年历史的电机控制中心(MCC)桶的振兴,提高了员工和设施设备的安全性,延长了电机控制中心(MCC)的整体寿命,提高了员工的技能,并为新泽西州泽西城的美国邮政设施节省了100多万美元
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Revitalizing and refurbishment of motor control centers AT NJI & BMC
This paper provides a case study of considering an economical evaluation comparing a traditional approach of completely demolishing old electrical MCCs equipment versus investigating and replacing only the malfunctioning components in the MCC. The example below illustrates how a thorough investigation of existing electrical equipment can entirely alter previous planning decisions and have a drastic impact on cost estimates. A case study detailing the revitalization of 276, thirty three year old Motor Control Center (MCC) buckets, improved safety and security for our employees and facility equipment, extended overall life of the motor control center (MCCs), enhanced skills of our employees, and saved more than one million dollars for the US Postal facility-at Jersey City, NJ
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信