{"title":"从波士顿爱迪生公司控制室增强项目中获得的教训/经验","authors":"N.R. Eisenmann, D.M. Beith, D. Shawver","doi":"10.1109/HFPP.1992.283394","DOIUrl":null,"url":null,"abstract":"The Boston Edison Company implemented the first phase of a control room enhancement project at the Pilgrim Nuclear Power Station. The project consists of several tasks, such as control panel painting, control panel relabeling, an upgrade of the control room lighting, etc. These tasks implemented the corrective actions identified during one of the Three Mile Island (TMI)-related activities, i.e., the detailed control room design review (DCRDR). The control panel relabeling and painting tasks and the control room lighting upgrade are described. Issues that were identified in the implementation of these enhancements as well as lessons learned from these projects are discussed.<<ETX>>","PeriodicalId":150946,"journal":{"name":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Lessons/experience learned from the Boston Edison Company control room enhancement project\",\"authors\":\"N.R. Eisenmann, D.M. Beith, D. Shawver\",\"doi\":\"10.1109/HFPP.1992.283394\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Boston Edison Company implemented the first phase of a control room enhancement project at the Pilgrim Nuclear Power Station. The project consists of several tasks, such as control panel painting, control panel relabeling, an upgrade of the control room lighting, etc. These tasks implemented the corrective actions identified during one of the Three Mile Island (TMI)-related activities, i.e., the detailed control room design review (DCRDR). The control panel relabeling and painting tasks and the control room lighting upgrade are described. Issues that were identified in the implementation of these enhancements as well as lessons learned from these projects are discussed.<<ETX>>\",\"PeriodicalId\":150946,\"journal\":{\"name\":\"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants\",\"volume\":\"15 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/HFPP.1992.283394\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/HFPP.1992.283394","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

波士顿爱迪生公司实施了Pilgrim核电站控制室改进项目的第一阶段。该项目包括几项任务,如控制板喷漆、控制板重新贴标签、控制室照明升级等。这些任务实施了在三里岛(TMI)相关活动中确定的纠正措施,即详细控制室设计评审(DCRDR)。描述了控制板的重新贴标签和喷漆任务以及控制室的照明升级。讨论了在实施这些增强功能时发现的问题以及从这些项目中吸取的经验教训。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Lessons/experience learned from the Boston Edison Company control room enhancement project
The Boston Edison Company implemented the first phase of a control room enhancement project at the Pilgrim Nuclear Power Station. The project consists of several tasks, such as control panel painting, control panel relabeling, an upgrade of the control room lighting, etc. These tasks implemented the corrective actions identified during one of the Three Mile Island (TMI)-related activities, i.e., the detailed control room design review (DCRDR). The control panel relabeling and painting tasks and the control room lighting upgrade are described. Issues that were identified in the implementation of these enhancements as well as lessons learned from these projects are discussed.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信