考虑TRL校准套件不完备性的时域分析不确定度估计研究

Y. Kato, M. Horibe
{"title":"考虑TRL校准套件不完备性的时域分析不确定度估计研究","authors":"Y. Kato, M. Horibe","doi":"10.1109/EUMC.2015.7345931","DOIUrl":null,"url":null,"abstract":"We have developed a new algorithm of the Monte-Carlo calculation for the uncertainty evaluation of time-domain measurements, which directly relates to the incompleteness of a calibration standard used on a vector network analyzer. In contrast to the previous study, the propagation of S-parameter uncertainty is considered, and correlations between measured S-parameters at different frequency points are rigorously taken into account, which is important because the time-domain analysis treats the frequency dependence of the S-parameter. We confirmed that the uncertainty of the peak determination at the time-domain is strongly affected by S-parameter uncertainties especially when we measure time-domain signals including multiple peaks, and quantitatively clarified that it is essential for the uncertainty analysis of time-domain measurements to evaluate the propagation of S-parameter uncertainties appropriately.","PeriodicalId":350086,"journal":{"name":"2015 European Microwave Conference (EuMC)","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"A study of uncertainty estimation for time-domain analysis by considering incompleteness of TRL calibration kit\",\"authors\":\"Y. Kato, M. Horibe\",\"doi\":\"10.1109/EUMC.2015.7345931\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We have developed a new algorithm of the Monte-Carlo calculation for the uncertainty evaluation of time-domain measurements, which directly relates to the incompleteness of a calibration standard used on a vector network analyzer. In contrast to the previous study, the propagation of S-parameter uncertainty is considered, and correlations between measured S-parameters at different frequency points are rigorously taken into account, which is important because the time-domain analysis treats the frequency dependence of the S-parameter. We confirmed that the uncertainty of the peak determination at the time-domain is strongly affected by S-parameter uncertainties especially when we measure time-domain signals including multiple peaks, and quantitatively clarified that it is essential for the uncertainty analysis of time-domain measurements to evaluate the propagation of S-parameter uncertainties appropriately.\",\"PeriodicalId\":350086,\"journal\":{\"name\":\"2015 European Microwave Conference (EuMC)\",\"volume\":\"19 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-12-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 European Microwave Conference (EuMC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EUMC.2015.7345931\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 European Microwave Conference (EuMC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EUMC.2015.7345931","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文开发了一种新的蒙特卡罗计算算法,用于时域测量的不确定度评定,这直接关系到矢量网络分析仪使用的校准标准的不完全性。与以往的研究不同,本文考虑了s参数不确定性的传播,并严格考虑了不同频率点上实测s参数之间的相关性,这一点很重要,因为时域分析要处理s参数的频率依赖性。我们证实了s参数不确定性对时域测峰的不确定性的强烈影响,特别是当我们测量包含多个峰的时域信号时,并定量地阐明了对s参数不确定性传播的适当评估对时域测量的不确定性分析至关重要。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A study of uncertainty estimation for time-domain analysis by considering incompleteness of TRL calibration kit
We have developed a new algorithm of the Monte-Carlo calculation for the uncertainty evaluation of time-domain measurements, which directly relates to the incompleteness of a calibration standard used on a vector network analyzer. In contrast to the previous study, the propagation of S-parameter uncertainty is considered, and correlations between measured S-parameters at different frequency points are rigorously taken into account, which is important because the time-domain analysis treats the frequency dependence of the S-parameter. We confirmed that the uncertainty of the peak determination at the time-domain is strongly affected by S-parameter uncertainties especially when we measure time-domain signals including multiple peaks, and quantitatively clarified that it is essential for the uncertainty analysis of time-domain measurements to evaluate the propagation of S-parameter uncertainties appropriately.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信