M. Newton, R.E. Kamni, E. Fulkerson, S. Hulsey, N. Lao, G. Parrish, D. Pendleton, D. Petersen, M. Polk, J. Tuck, G. Ullery, W. Moore
{"title":"国家点火设施电力调节系统的初始启动和运行","authors":"M. Newton, R.E. Kamni, E. Fulkerson, S. Hulsey, N. Lao, G. Parrish, D. Pendleton, D. Petersen, M. Polk, J. Tuck, G. Ullery, W. Moore","doi":"10.1109/PPC.2003.1277668","DOIUrl":null,"url":null,"abstract":"The National Ignition Facility (NIF) Power Conditioning System (PCS) is a modular capacitive energy storage system that will be capable of storing nearly 400 MJ of electrical energy and delivering that energy to the nearly 8000 flashlamps in the NIF laser. The first sixteen modules of the power conditioning system have been built, tested and installed. Activation of the first nine power conditioning modules has been completed and commissioning of the first \"bundle\" of laser beamlines has begun. This paper will provide an overview of the power conditioning system design and describe the status and results of initial testing and activation of the first \"bundle\" of power conditioning modules.","PeriodicalId":143385,"journal":{"name":"Digest of Technical Papers. PPC-2003. 14th IEEE International Pulsed Power Conference (IEEE Cat. No.03CH37472)","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":"{\"title\":\"Initial activation and operation of the power conditioning system for the national ignition facility\",\"authors\":\"M. Newton, R.E. Kamni, E. Fulkerson, S. Hulsey, N. Lao, G. Parrish, D. Pendleton, D. Petersen, M. Polk, J. Tuck, G. Ullery, W. Moore\",\"doi\":\"10.1109/PPC.2003.1277668\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The National Ignition Facility (NIF) Power Conditioning System (PCS) is a modular capacitive energy storage system that will be capable of storing nearly 400 MJ of electrical energy and delivering that energy to the nearly 8000 flashlamps in the NIF laser. The first sixteen modules of the power conditioning system have been built, tested and installed. Activation of the first nine power conditioning modules has been completed and commissioning of the first \\\"bundle\\\" of laser beamlines has begun. This paper will provide an overview of the power conditioning system design and describe the status and results of initial testing and activation of the first \\\"bundle\\\" of power conditioning modules.\",\"PeriodicalId\":143385,\"journal\":{\"name\":\"Digest of Technical Papers. PPC-2003. 14th IEEE International Pulsed Power Conference (IEEE Cat. No.03CH37472)\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2003-06-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"12\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Digest of Technical Papers. PPC-2003. 14th IEEE International Pulsed Power Conference (IEEE Cat. No.03CH37472)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PPC.2003.1277668\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Digest of Technical Papers. PPC-2003. 14th IEEE International Pulsed Power Conference (IEEE Cat. No.03CH37472)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PPC.2003.1277668","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Initial activation and operation of the power conditioning system for the national ignition facility
The National Ignition Facility (NIF) Power Conditioning System (PCS) is a modular capacitive energy storage system that will be capable of storing nearly 400 MJ of electrical energy and delivering that energy to the nearly 8000 flashlamps in the NIF laser. The first sixteen modules of the power conditioning system have been built, tested and installed. Activation of the first nine power conditioning modules has been completed and commissioning of the first "bundle" of laser beamlines has begun. This paper will provide an overview of the power conditioning system design and describe the status and results of initial testing and activation of the first "bundle" of power conditioning modules.