{"title":"用于GATE模型校准的德国电力市场数据文件- NDP 2025(2015版)","authors":"M. Ambrosius, Veronika Grimm, Bastian Rückel, C. Sölch, Gregor Zöttl","doi":"10.2139/ssrn.3365830","DOIUrl":null,"url":null,"abstract":"In this data documentation, we provide detailed information on the data that is used in order to calibrate the GATE model. Since we are looking at the hypothetical German electricity market in 2035 and the resulting investment incentives, we have to select all exogenous parameters based on future forecasts for this period. We consider the German market area since excellent data are available from the political processes that accompany the network expansion planning procedure. In order to ensure a high degree of consistency of the exogenous parameters - and in order to allow comparisons with other forecasts for that market area - we predominantly use input parameters from the Network Development Plan Electricity (NDP) which is the official basis for network expansion planning in Germany. Hereby, we mainly rely on the NDP 2025, where network expansion required until 2025 is determined, in its 2015 version.","PeriodicalId":403142,"journal":{"name":"ERN: Other Econometrics: Applied Econometric Modeling in Agriculture","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Data Documentation for the German Electricity Market Used for the Calibration of the GATE Model - NDP 2025 (Version 2015)\",\"authors\":\"M. Ambrosius, Veronika Grimm, Bastian Rückel, C. Sölch, Gregor Zöttl\",\"doi\":\"10.2139/ssrn.3365830\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this data documentation, we provide detailed information on the data that is used in order to calibrate the GATE model. Since we are looking at the hypothetical German electricity market in 2035 and the resulting investment incentives, we have to select all exogenous parameters based on future forecasts for this period. We consider the German market area since excellent data are available from the political processes that accompany the network expansion planning procedure. In order to ensure a high degree of consistency of the exogenous parameters - and in order to allow comparisons with other forecasts for that market area - we predominantly use input parameters from the Network Development Plan Electricity (NDP) which is the official basis for network expansion planning in Germany. Hereby, we mainly rely on the NDP 2025, where network expansion required until 2025 is determined, in its 2015 version.\",\"PeriodicalId\":403142,\"journal\":{\"name\":\"ERN: Other Econometrics: Applied Econometric Modeling in Agriculture\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ERN: Other Econometrics: Applied Econometric Modeling in Agriculture\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.3365830\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ERN: Other Econometrics: Applied Econometric Modeling in Agriculture","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.3365830","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在此数据文档中,我们提供了用于校准GATE模型的数据的详细信息。由于我们考虑的是2035年德国电力市场的假设以及由此产生的投资激励,我们必须根据这一时期的未来预测来选择所有外生参数。我们考虑德国市场区域,因为伴随着网络扩展规划程序的政治进程提供了优秀的数据。为了确保外源参数的高度一致性,也为了与该市场区域的其他预测进行比较,我们主要使用来自电网发展计划电力(NDP)的输入参数,这是德国电网扩张规划的官方基础。因此,我们主要依赖2015年版本的NDP 2025,其中确定了到2025年所需的网络扩展。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Data Documentation for the German Electricity Market Used for the Calibration of the GATE Model - NDP 2025 (Version 2015)
In this data documentation, we provide detailed information on the data that is used in order to calibrate the GATE model. Since we are looking at the hypothetical German electricity market in 2035 and the resulting investment incentives, we have to select all exogenous parameters based on future forecasts for this period. We consider the German market area since excellent data are available from the political processes that accompany the network expansion planning procedure. In order to ensure a high degree of consistency of the exogenous parameters - and in order to allow comparisons with other forecasts for that market area - we predominantly use input parameters from the Network Development Plan Electricity (NDP) which is the official basis for network expansion planning in Germany. Hereby, we mainly rely on the NDP 2025, where network expansion required until 2025 is determined, in its 2015 version.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信