R. Allison, J. Yu, L. Tsai, Chih-Ming Liu, M. Drummond, D. Kayton, T. Sustae, J. Witte
{"title":"宏观模型开发是工厂级仿真与LP企业系统之间的桥梁","authors":"R. Allison, J. Yu, L. Tsai, Chih-Ming Liu, M. Drummond, D. Kayton, T. Sustae, J. Witte","doi":"10.1109/IEMT.1997.626953","DOIUrl":null,"url":null,"abstract":"The representation of a factory-level capacity model and an enterprise-level model have traditionally been incompatible. The goal of this study is to resolve the incompatibility problem. Factory systems contain detailed data striving to accurately predict facility capabilities. Enterprise optimization systems prefer an aggregation of data, representing key bottleneck resources throughout a corporation. The focus on key resources reduces modeling complexity and subsequently reduces the problem solving cycle. This study attempts to build a bridge between the capabilities of a factory simulation-based capacity planning software tool, ManSim(R)/X, and an enterprise optimization system, TEOS/sup TM/ (TYECIN Enterprise Optimization System), both from TYECIN Systems Inc. The project involves studying the predecessor of TEOS (IMPReSS 2.0) at Harris Semiconductor in Findlay, Ohio.","PeriodicalId":227971,"journal":{"name":"Twenty First IEEE/CPMT International Electronics Manufacturing Technology Symposium Proceedings 1997 IEMT Symposium","volume":"52 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-10-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Macro model development as a bridge between factory level simulation and LP enterprise systems\",\"authors\":\"R. Allison, J. Yu, L. Tsai, Chih-Ming Liu, M. Drummond, D. Kayton, T. Sustae, J. Witte\",\"doi\":\"10.1109/IEMT.1997.626953\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The representation of a factory-level capacity model and an enterprise-level model have traditionally been incompatible. The goal of this study is to resolve the incompatibility problem. Factory systems contain detailed data striving to accurately predict facility capabilities. Enterprise optimization systems prefer an aggregation of data, representing key bottleneck resources throughout a corporation. The focus on key resources reduces modeling complexity and subsequently reduces the problem solving cycle. This study attempts to build a bridge between the capabilities of a factory simulation-based capacity planning software tool, ManSim(R)/X, and an enterprise optimization system, TEOS/sup TM/ (TYECIN Enterprise Optimization System), both from TYECIN Systems Inc. The project involves studying the predecessor of TEOS (IMPReSS 2.0) at Harris Semiconductor in Findlay, Ohio.\",\"PeriodicalId\":227971,\"journal\":{\"name\":\"Twenty First IEEE/CPMT International Electronics Manufacturing Technology Symposium Proceedings 1997 IEMT Symposium\",\"volume\":\"52 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1997-10-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Twenty First IEEE/CPMT International Electronics Manufacturing Technology Symposium Proceedings 1997 IEMT Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEMT.1997.626953\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Twenty First IEEE/CPMT International Electronics Manufacturing Technology Symposium Proceedings 1997 IEMT Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMT.1997.626953","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4
摘要
工厂级容量模型的表示和企业级模型的表示传统上是不兼容的。本研究的目的是解决不相容问题。工厂系统包含详细的数据,力求准确地预测工厂的能力。企业优化系统更喜欢数据聚合,代表整个公司的关键瓶颈资源。对关键资源的关注减少了建模的复杂性,并随后减少了问题解决周期。本研究试图在基于工厂模拟的产能规划软件工具ManSim(R)/X和企业优化系统TEOS/sup TM/ (TYECIN企业优化系统)之间建立一座桥梁,两者都来自TYECIN Systems Inc.。该项目包括在俄亥俄州芬德雷的哈里斯半导体公司研究TEOS的前身(IMPReSS 2.0)。
Macro model development as a bridge between factory level simulation and LP enterprise systems
The representation of a factory-level capacity model and an enterprise-level model have traditionally been incompatible. The goal of this study is to resolve the incompatibility problem. Factory systems contain detailed data striving to accurately predict facility capabilities. Enterprise optimization systems prefer an aggregation of data, representing key bottleneck resources throughout a corporation. The focus on key resources reduces modeling complexity and subsequently reduces the problem solving cycle. This study attempts to build a bridge between the capabilities of a factory simulation-based capacity planning software tool, ManSim(R)/X, and an enterprise optimization system, TEOS/sup TM/ (TYECIN Enterprise Optimization System), both from TYECIN Systems Inc. The project involves studying the predecessor of TEOS (IMPReSS 2.0) at Harris Semiconductor in Findlay, Ohio.