Gederson A. da Cruz, S. Haffner, Bibiana P. Ferraz, M. Resener, B. Venkatesh
{"title":"考虑可靠性的配电系统扩容规划问题模型","authors":"Gederson A. da Cruz, S. Haffner, Bibiana P. Ferraz, M. Resener, B. Venkatesh","doi":"10.1109/ISGTLatinAmerica52371.2021.9543067","DOIUrl":null,"url":null,"abstract":"This paper presents a mixed-integer linear programming model for the expansion planning problem of power distribution systems (PDS). The objective function considers the investment costs of reconductoring existing branches and adding new branches, and operation costs, accounting for maintenance, energy losses, and voltage violations costs. Reliability is considered in the optimization model through the energy not supplied, system average interruption duration, and system average interruption frequency indexes, using a reward-penalty formulation. Numerical results are presented for a 54-node distribution system, comparing the expansion plans obtained when reliability assessment is considered or not in the objective function. The obtained results show the relevance of considering reliability indexes in the expansion planning of PDS.","PeriodicalId":120262,"journal":{"name":"2021 IEEE PES Innovative Smart Grid Technologies Conference - Latin America (ISGT Latin America)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Model for the expansion planning problem of distribution systems considering reliability\",\"authors\":\"Gederson A. da Cruz, S. Haffner, Bibiana P. Ferraz, M. Resener, B. Venkatesh\",\"doi\":\"10.1109/ISGTLatinAmerica52371.2021.9543067\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a mixed-integer linear programming model for the expansion planning problem of power distribution systems (PDS). The objective function considers the investment costs of reconductoring existing branches and adding new branches, and operation costs, accounting for maintenance, energy losses, and voltage violations costs. Reliability is considered in the optimization model through the energy not supplied, system average interruption duration, and system average interruption frequency indexes, using a reward-penalty formulation. Numerical results are presented for a 54-node distribution system, comparing the expansion plans obtained when reliability assessment is considered or not in the objective function. The obtained results show the relevance of considering reliability indexes in the expansion planning of PDS.\",\"PeriodicalId\":120262,\"journal\":{\"name\":\"2021 IEEE PES Innovative Smart Grid Technologies Conference - Latin America (ISGT Latin America)\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 IEEE PES Innovative Smart Grid Technologies Conference - Latin America (ISGT Latin America)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISGTLatinAmerica52371.2021.9543067\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE PES Innovative Smart Grid Technologies Conference - Latin America (ISGT Latin America)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGTLatinAmerica52371.2021.9543067","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Model for the expansion planning problem of distribution systems considering reliability
This paper presents a mixed-integer linear programming model for the expansion planning problem of power distribution systems (PDS). The objective function considers the investment costs of reconductoring existing branches and adding new branches, and operation costs, accounting for maintenance, energy losses, and voltage violations costs. Reliability is considered in the optimization model through the energy not supplied, system average interruption duration, and system average interruption frequency indexes, using a reward-penalty formulation. Numerical results are presented for a 54-node distribution system, comparing the expansion plans obtained when reliability assessment is considered or not in the objective function. The obtained results show the relevance of considering reliability indexes in the expansion planning of PDS.