随钻油藏综合建模提高渤海湾某复杂海上油田水平井布局和产能

Min Mao, Linlong Bai, Wenzhong Shen, Xiao Qiang Li, Z. Xia
{"title":"随钻油藏综合建模提高渤海湾某复杂海上油田水平井布局和产能","authors":"Min Mao, Linlong Bai, Wenzhong Shen, Xiao Qiang Li, Z. Xia","doi":"10.2118/191065-MS","DOIUrl":null,"url":null,"abstract":"\n Horizontal wells are being a common practice in offshore field development in Bohai Bay recently. Maintaining well trajectory in sweep spot while drilling is one of the key factors to optimize horizontal well’s productivity. However, great challenges are often faced in Bohai Bay area including survey uncertainties while drilling and reservoir geology variation. On the one hand, successful placement of a horizontal well requires accurate landing of the well in the right position and orientation in the reservoir. On the other hand, the trajectory is optimized based on structural geobody variation resulted from the uncertainty of parameters governing the static behavior of the field. Therefore, the ability to update geosteering model in timely manner and to proactively adjust well trajectory in real time are required.\n This paper presents an innovative method in Bohai Bay by applying the technology of integrated seismic volume and reservoir geosteering model while drilling to achieve very promising productivity. That is to say, the new geosteering method includes seismic inversion of checkshot calibrating, single/multi-wells reservoir model updating, conventional logging while drilling, and mud logging etc. How to develop new horizontal well steering methodology and software integrated seismic volume of time (or depth) domain, logging while drilling, reservoir modeling result to optimize well planning and placement for high productivity?\n Results from lower Neogene Minghuazhen formation tests executed in SuiZhong 36-1, Bozhong oilfield of Bohai Bay clearly demonstrate the following capabilities of the technology.Reduction of the steering need for the tools of distance to boundary included Directional and deep well placement tool.A bridge from three-dimensional geology model to two-dimensional geosteering model before drilling; vice versa, 2D geosteering model update 3D geological model after drilling.\n More People grasp the systematical methodology of integrated reservoir geosteering model and trajectory optimizing while drilling which provide a higher degree of confidence in the drilling process.","PeriodicalId":133825,"journal":{"name":"Day 3 Wed, August 29, 2018","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integrated Reservoir Modeling while Drilling Enhances Horizontal Well Placement and Productivity in a Complex Offshore Field, Bohai Bay\",\"authors\":\"Min Mao, Linlong Bai, Wenzhong Shen, Xiao Qiang Li, Z. Xia\",\"doi\":\"10.2118/191065-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Horizontal wells are being a common practice in offshore field development in Bohai Bay recently. Maintaining well trajectory in sweep spot while drilling is one of the key factors to optimize horizontal well’s productivity. However, great challenges are often faced in Bohai Bay area including survey uncertainties while drilling and reservoir geology variation. On the one hand, successful placement of a horizontal well requires accurate landing of the well in the right position and orientation in the reservoir. On the other hand, the trajectory is optimized based on structural geobody variation resulted from the uncertainty of parameters governing the static behavior of the field. Therefore, the ability to update geosteering model in timely manner and to proactively adjust well trajectory in real time are required.\\n This paper presents an innovative method in Bohai Bay by applying the technology of integrated seismic volume and reservoir geosteering model while drilling to achieve very promising productivity. That is to say, the new geosteering method includes seismic inversion of checkshot calibrating, single/multi-wells reservoir model updating, conventional logging while drilling, and mud logging etc. How to develop new horizontal well steering methodology and software integrated seismic volume of time (or depth) domain, logging while drilling, reservoir modeling result to optimize well planning and placement for high productivity?\\n Results from lower Neogene Minghuazhen formation tests executed in SuiZhong 36-1, Bozhong oilfield of Bohai Bay clearly demonstrate the following capabilities of the technology.Reduction of the steering need for the tools of distance to boundary included Directional and deep well placement tool.A bridge from three-dimensional geology model to two-dimensional geosteering model before drilling; vice versa, 2D geosteering model update 3D geological model after drilling.\\n More People grasp the systematical methodology of integrated reservoir geosteering model and trajectory optimizing while drilling which provide a higher degree of confidence in the drilling process.\",\"PeriodicalId\":133825,\"journal\":{\"name\":\"Day 3 Wed, August 29, 2018\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-08-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, August 29, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/191065-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, August 29, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/191065-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

近年来,水平井开发已成为渤海湾海上油田开发的普遍做法。在钻进过程中保持波及点的井眼轨迹是水平井产能优化的关键因素之一。然而,渤海湾地区在钻井过程中经常面临测量不确定性和储层地质变化等巨大挑战。一方面,水平井的成功安置需要将井准确地定位在油藏的正确位置和方向。另一方面,由于控制场静态行为的参数的不确定性,构造地质体的变化导致了轨迹的优化。因此,需要能够及时更新地质导向模型,并实时主动调整井眼轨迹。本文在渤海湾地区提出了一种创新的方法,即采用随钻综合地震体和储层地质导向模型技术,取得了很好的产能。也就是说,新的地质导向方法包括地震反演校验、单井/多井储层模型更新、常规随钻测井、泥浆测井等。如何开发新的水平井导向方法和软件,将地震时间(或深度)域、随钻测井、油藏建模结果集成在一起,以优化井的规划和布置,实现高产能?渤海湾渤中油田绥中36-1下新近系明化镇地层试验结果表明,该技术具有以下能力:减少了对边界距离导向工具的需求,包括定向井和深井定位工具。钻井前从三维地质模型到二维地质导向模型的桥梁;反之,二维地质导向模型在钻探后更新三维地质模型。越来越多的人掌握了油藏综合地质导向模型和随钻轨迹优化的系统方法,为钻井过程提供了更高的信心。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integrated Reservoir Modeling while Drilling Enhances Horizontal Well Placement and Productivity in a Complex Offshore Field, Bohai Bay
Horizontal wells are being a common practice in offshore field development in Bohai Bay recently. Maintaining well trajectory in sweep spot while drilling is one of the key factors to optimize horizontal well’s productivity. However, great challenges are often faced in Bohai Bay area including survey uncertainties while drilling and reservoir geology variation. On the one hand, successful placement of a horizontal well requires accurate landing of the well in the right position and orientation in the reservoir. On the other hand, the trajectory is optimized based on structural geobody variation resulted from the uncertainty of parameters governing the static behavior of the field. Therefore, the ability to update geosteering model in timely manner and to proactively adjust well trajectory in real time are required. This paper presents an innovative method in Bohai Bay by applying the technology of integrated seismic volume and reservoir geosteering model while drilling to achieve very promising productivity. That is to say, the new geosteering method includes seismic inversion of checkshot calibrating, single/multi-wells reservoir model updating, conventional logging while drilling, and mud logging etc. How to develop new horizontal well steering methodology and software integrated seismic volume of time (or depth) domain, logging while drilling, reservoir modeling result to optimize well planning and placement for high productivity? Results from lower Neogene Minghuazhen formation tests executed in SuiZhong 36-1, Bozhong oilfield of Bohai Bay clearly demonstrate the following capabilities of the technology.Reduction of the steering need for the tools of distance to boundary included Directional and deep well placement tool.A bridge from three-dimensional geology model to two-dimensional geosteering model before drilling; vice versa, 2D geosteering model update 3D geological model after drilling. More People grasp the systematical methodology of integrated reservoir geosteering model and trajectory optimizing while drilling which provide a higher degree of confidence in the drilling process.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信