国家关键基础设施系统业务连续性管理的最大可容忍中断期计算研究——以居民供水领域为例

H. Seo, Yon Ha Chung, So Dam Kim, Ho-Haeng Lee, Tae Jung Song
{"title":"国家关键基础设施系统业务连续性管理的最大可容忍中断期计算研究——以居民供水领域为例","authors":"H. Seo, Yon Ha Chung, So Dam Kim, Ho-Haeng Lee, Tae Jung Song","doi":"10.14251/crisisonomy.2023.19.2.27","DOIUrl":null,"url":null,"abstract":"In this study, we tried to suggest a method for calculating the maximum tolerable period of disruption (MTPD) in water supply facilities among national core infrastructure facilities. Currently, the method for estimating the MTPD of national core infrastructure includes the amount of resources available and the recovery time of functions, but there is no specific standard or methodology. By analyzing previous studies and case studies, the framework for determining MTPD using added value among economic factors was confirmed and verified. Based on the framework, it was possible to determine the applicability by deriving estimates in Gongchon. Water Purification Plant in Incheon among domestic water supply facilities. In future research, we intend to conduct verification research on the possibility of actual utilization by identifying the reduction rate of added value targeting national core infrastructure in other fields and applying the framework derived through case study.","PeriodicalId":395795,"journal":{"name":"Crisis and Emergency Management: Theory and Praxis","volume":"291 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Study on the Calculation of the Maximum Tolerable Period of Disruption for Business Continuity Management of National Critical Infrastructure Systems: A Case Study in the Field of Residential Water Supply\",\"authors\":\"H. Seo, Yon Ha Chung, So Dam Kim, Ho-Haeng Lee, Tae Jung Song\",\"doi\":\"10.14251/crisisonomy.2023.19.2.27\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this study, we tried to suggest a method for calculating the maximum tolerable period of disruption (MTPD) in water supply facilities among national core infrastructure facilities. Currently, the method for estimating the MTPD of national core infrastructure includes the amount of resources available and the recovery time of functions, but there is no specific standard or methodology. By analyzing previous studies and case studies, the framework for determining MTPD using added value among economic factors was confirmed and verified. Based on the framework, it was possible to determine the applicability by deriving estimates in Gongchon. Water Purification Plant in Incheon among domestic water supply facilities. In future research, we intend to conduct verification research on the possibility of actual utilization by identifying the reduction rate of added value targeting national core infrastructure in other fields and applying the framework derived through case study.\",\"PeriodicalId\":395795,\"journal\":{\"name\":\"Crisis and Emergency Management: Theory and Praxis\",\"volume\":\"291 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Crisis and Emergency Management: Theory and Praxis\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14251/crisisonomy.2023.19.2.27\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Crisis and Emergency Management: Theory and Praxis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14251/crisisonomy.2023.19.2.27","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在本研究中,我们试图提出一种计算国家核心基础设施中供水设施最大可容忍中断期(MTPD)的方法。目前,估算国家核心基础设施中期发展计划的方法包括可用资源量和功能恢复时间,但没有具体的标准和方法。通过分析前人研究和案例分析,确定并验证了利用经济要素间的附加价值确定MTPD的框架。以该框架为基础,在公川进行估算,可以确定适用性。生活供水设施中的仁川水净化厂。在未来的研究中,我们打算通过确定国家核心基础设施在其他领域的增加值降低率,并应用通过案例研究得出的框架,对实际利用的可能性进行验证研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Study on the Calculation of the Maximum Tolerable Period of Disruption for Business Continuity Management of National Critical Infrastructure Systems: A Case Study in the Field of Residential Water Supply
In this study, we tried to suggest a method for calculating the maximum tolerable period of disruption (MTPD) in water supply facilities among national core infrastructure facilities. Currently, the method for estimating the MTPD of national core infrastructure includes the amount of resources available and the recovery time of functions, but there is no specific standard or methodology. By analyzing previous studies and case studies, the framework for determining MTPD using added value among economic factors was confirmed and verified. Based on the framework, it was possible to determine the applicability by deriving estimates in Gongchon. Water Purification Plant in Incheon among domestic water supply facilities. In future research, we intend to conduct verification research on the possibility of actual utilization by identifying the reduction rate of added value targeting national core infrastructure in other fields and applying the framework derived through case study.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信