Sungjae Kim, E. Shragowitz, G. Karypis, Rung-Bin Lin
{"title":"可预测性能的浇口尺寸和构造位置的交织","authors":"Sungjae Kim, E. Shragowitz, G. Karypis, Rung-Bin Lin","doi":"10.1109/VDAT.2007.373225","DOIUrl":null,"url":null,"abstract":"This paper presents a fast fixed-die standard cell placement algorithm. Placement is achieved by a combination of top-down partitioning with the incremental row-by-row construction. This paper concentrates on the construction part of this process. Gate sizing is interleaved with the placement construction process. Before placement, every gate is given its minimal size. During the placement, gates are resized to satisfy the timing constraints. Behavior of the placement is adapted based on dynamically recomputed net delay bounds. Experimental results show significant improvement in timing, predictability of results, and run time with respect to a commercial placement tool.","PeriodicalId":137915,"journal":{"name":"2007 International Symposium on VLSI Design, Automation and Test (VLSI-DAT)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Interleaving of Gate Sizing and Constructive Placement for Predictable Performance\",\"authors\":\"Sungjae Kim, E. Shragowitz, G. Karypis, Rung-Bin Lin\",\"doi\":\"10.1109/VDAT.2007.373225\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a fast fixed-die standard cell placement algorithm. Placement is achieved by a combination of top-down partitioning with the incremental row-by-row construction. This paper concentrates on the construction part of this process. Gate sizing is interleaved with the placement construction process. Before placement, every gate is given its minimal size. During the placement, gates are resized to satisfy the timing constraints. Behavior of the placement is adapted based on dynamically recomputed net delay bounds. Experimental results show significant improvement in timing, predictability of results, and run time with respect to a commercial placement tool.\",\"PeriodicalId\":137915,\"journal\":{\"name\":\"2007 International Symposium on VLSI Design, Automation and Test (VLSI-DAT)\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-04-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 International Symposium on VLSI Design, Automation and Test (VLSI-DAT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/VDAT.2007.373225\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 International Symposium on VLSI Design, Automation and Test (VLSI-DAT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/VDAT.2007.373225","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Interleaving of Gate Sizing and Constructive Placement for Predictable Performance
This paper presents a fast fixed-die standard cell placement algorithm. Placement is achieved by a combination of top-down partitioning with the incremental row-by-row construction. This paper concentrates on the construction part of this process. Gate sizing is interleaved with the placement construction process. Before placement, every gate is given its minimal size. During the placement, gates are resized to satisfy the timing constraints. Behavior of the placement is adapted based on dynamically recomputed net delay bounds. Experimental results show significant improvement in timing, predictability of results, and run time with respect to a commercial placement tool.