可预测性能的浇口尺寸和构造位置的交织

Sungjae Kim, E. Shragowitz, G. Karypis, Rung-Bin Lin
{"title":"可预测性能的浇口尺寸和构造位置的交织","authors":"Sungjae Kim, E. Shragowitz, G. Karypis, Rung-Bin Lin","doi":"10.1109/VDAT.2007.373225","DOIUrl":null,"url":null,"abstract":"This paper presents a fast fixed-die standard cell placement algorithm. Placement is achieved by a combination of top-down partitioning with the incremental row-by-row construction. This paper concentrates on the construction part of this process. Gate sizing is interleaved with the placement construction process. Before placement, every gate is given its minimal size. During the placement, gates are resized to satisfy the timing constraints. Behavior of the placement is adapted based on dynamically recomputed net delay bounds. Experimental results show significant improvement in timing, predictability of results, and run time with respect to a commercial placement tool.","PeriodicalId":137915,"journal":{"name":"2007 International Symposium on VLSI Design, Automation and Test (VLSI-DAT)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Interleaving of Gate Sizing and Constructive Placement for Predictable Performance\",\"authors\":\"Sungjae Kim, E. Shragowitz, G. Karypis, Rung-Bin Lin\",\"doi\":\"10.1109/VDAT.2007.373225\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a fast fixed-die standard cell placement algorithm. Placement is achieved by a combination of top-down partitioning with the incremental row-by-row construction. This paper concentrates on the construction part of this process. Gate sizing is interleaved with the placement construction process. Before placement, every gate is given its minimal size. During the placement, gates are resized to satisfy the timing constraints. Behavior of the placement is adapted based on dynamically recomputed net delay bounds. Experimental results show significant improvement in timing, predictability of results, and run time with respect to a commercial placement tool.\",\"PeriodicalId\":137915,\"journal\":{\"name\":\"2007 International Symposium on VLSI Design, Automation and Test (VLSI-DAT)\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-04-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 International Symposium on VLSI Design, Automation and Test (VLSI-DAT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/VDAT.2007.373225\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 International Symposium on VLSI Design, Automation and Test (VLSI-DAT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/VDAT.2007.373225","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

提出了一种快速定模标准单元放置算法。放置是通过结合自顶向下分区和逐行增量构造来实现的。本文主要研究了该过程的构建部分。浇口尺寸与浇筑施工过程交织在一起。在放置之前,每个门都有其最小尺寸。在放置过程中,调整门的大小以满足时间约束。基于动态重新计算的网络延迟边界调整了布局行为。实验结果表明,与商业放置工具相比,在计时、结果可预测性和运行时间方面有了显著的改进。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Interleaving of Gate Sizing and Constructive Placement for Predictable Performance
This paper presents a fast fixed-die standard cell placement algorithm. Placement is achieved by a combination of top-down partitioning with the incremental row-by-row construction. This paper concentrates on the construction part of this process. Gate sizing is interleaved with the placement construction process. Before placement, every gate is given its minimal size. During the placement, gates are resized to satisfy the timing constraints. Behavior of the placement is adapted based on dynamically recomputed net delay bounds. Experimental results show significant improvement in timing, predictability of results, and run time with respect to a commercial placement tool.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信