{"title":"PVCS技术的实施对员工的影响,特别是在需求收集方面","authors":"Dermot Hore","doi":"10.1109/DEXA.1999.795196","DOIUrl":null,"url":null,"abstract":"This paper sets out the experiences of the staff of Optimal Systems Ltd. in using PVCS (Tracker and Version Manager modules) to support communication flow within the organisation. The process was supported by ESSI as the SEPIE project, Number 27469. Optimal Systems Ltd is a Dublin based company that is engaged in the design, development and delivery of application software for the electrical supply industry world-wide. Positive staff reaction is critical to the successful implementation of new technologies. The experiment is an 11 month project that commenced in July 1998 and is scheduled for completion in June 1999. This paper focuses on the impact on staff on the use of the new technology and their assessment of how it contributes to improving the development process. Particular emphasis is placed on the contribution of PVCS to the requirements development process, which is of particular concern to Optimal.","PeriodicalId":276867,"journal":{"name":"Proceedings. Tenth International Workshop on Database and Expert Systems Applications. DEXA 99","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The impact on staff of the implementation of PVCS technology with particular reference to requirements gathering\",\"authors\":\"Dermot Hore\",\"doi\":\"10.1109/DEXA.1999.795196\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper sets out the experiences of the staff of Optimal Systems Ltd. in using PVCS (Tracker and Version Manager modules) to support communication flow within the organisation. The process was supported by ESSI as the SEPIE project, Number 27469. Optimal Systems Ltd is a Dublin based company that is engaged in the design, development and delivery of application software for the electrical supply industry world-wide. Positive staff reaction is critical to the successful implementation of new technologies. The experiment is an 11 month project that commenced in July 1998 and is scheduled for completion in June 1999. This paper focuses on the impact on staff on the use of the new technology and their assessment of how it contributes to improving the development process. Particular emphasis is placed on the contribution of PVCS to the requirements development process, which is of particular concern to Optimal.\",\"PeriodicalId\":276867,\"journal\":{\"name\":\"Proceedings. Tenth International Workshop on Database and Expert Systems Applications. DEXA 99\",\"volume\":\"73 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings. Tenth International Workshop on Database and Expert Systems Applications. DEXA 99\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/DEXA.1999.795196\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings. Tenth International Workshop on Database and Expert Systems Applications. DEXA 99","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DEXA.1999.795196","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
本文阐述了Optimal Systems Ltd.员工使用PVCS(跟踪器和版本管理器模块)来支持组织内部通信流程的经验。该过程由ESSI作为SEPIE项目提供支持,编号27469。Optimal Systems Ltd是一家总部位于都柏林的公司,致力于为全球电力供应行业设计、开发和交付应用软件。工作人员的积极反应对新技术的成功实施至关重要。试验是一个为期11个月的项目,于1998年7月开始,定于1999年6月完成。本文的重点是对员工使用新技术的影响,以及他们如何评估新技术对改进开发过程的贡献。特别强调PVCS对需求开发过程的贡献,这是Optimal特别关注的。
The impact on staff of the implementation of PVCS technology with particular reference to requirements gathering
This paper sets out the experiences of the staff of Optimal Systems Ltd. in using PVCS (Tracker and Version Manager modules) to support communication flow within the organisation. The process was supported by ESSI as the SEPIE project, Number 27469. Optimal Systems Ltd is a Dublin based company that is engaged in the design, development and delivery of application software for the electrical supply industry world-wide. Positive staff reaction is critical to the successful implementation of new technologies. The experiment is an 11 month project that commenced in July 1998 and is scheduled for completion in June 1999. This paper focuses on the impact on staff on the use of the new technology and their assessment of how it contributes to improving the development process. Particular emphasis is placed on the contribution of PVCS to the requirements development process, which is of particular concern to Optimal.