再看一下团队合同

J. Bialik
{"title":"再看一下团队合同","authors":"J. Bialik","doi":"10.1109/IRET-EM.1960.5007539","DOIUrl":null,"url":null,"abstract":"Previous discussions concerning group contracting have been presented from a group leader viewpoint. The need was felt to view the group contracting arrangements from the associate contractor viewpoint. The experiences gained by over two and one-half years association in a group contract arrangement as an associate contractor are described. Areas of concern not normally encountered in a conventional contracting arrangement are described for prospective group contracting participants.","PeriodicalId":382847,"journal":{"name":"IRE Transactions on Engineering Management","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1960-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Another Look at Team Contracting\",\"authors\":\"J. Bialik\",\"doi\":\"10.1109/IRET-EM.1960.5007539\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Previous discussions concerning group contracting have been presented from a group leader viewpoint. The need was felt to view the group contracting arrangements from the associate contractor viewpoint. The experiences gained by over two and one-half years association in a group contract arrangement as an associate contractor are described. Areas of concern not normally encountered in a conventional contracting arrangement are described for prospective group contracting participants.\",\"PeriodicalId\":382847,\"journal\":{\"name\":\"IRE Transactions on Engineering Management\",\"volume\":\"19 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1960-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IRE Transactions on Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IRET-EM.1960.5007539\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IRE Transactions on Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IRET-EM.1960.5007539","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

以前关于集团承包的讨论是从集团领导的角度提出的。认为有必要从协理承包商的观点来看待集团承包安排。描述了作为协理承包商在集团合同安排中超过两年半的经验。在传统承包安排中通常不会遇到的关注领域被描述为潜在的集团承包参与者。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Another Look at Team Contracting
Previous discussions concerning group contracting have been presented from a group leader viewpoint. The need was felt to view the group contracting arrangements from the associate contractor viewpoint. The experiences gained by over two and one-half years association in a group contract arrangement as an associate contractor are described. Areas of concern not normally encountered in a conventional contracting arrangement are described for prospective group contracting participants.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信